EX-99.2 3 tm2311759d1_ex99-2.htm EXHIBIT 99.2

Exhibit 99.2

 

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The following discussion is management’s assessment and analysis of the results and financial condition of New Found Gold Corp. (the “Company” or “NFG”) and should be read in conjunction with the accompanying unaudited condensed interim financial statements and related notes. The financial data was prepared using accounting policies consistent with International Financial Reporting Standards (“IFRS”) and all figures are reported in Canadian dollars unless otherwise indicated. Please refer to the cautionary note regarding forward-looking statements and information within this Management’s Discussion & Analysis (“MD&A”) and the Risks Factors discussed in the Company’s most recent Annual Information Form on file with the Canadian provincial securities, regulatory authorities and Form 40-F on file with the U.S. Securities and Exchange Commission (the “SEC”).

 

This MD&A contains forward-looking information and forward-looking statements, within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities legislation, (collectively, “forward-looking statements”), that involve numerous risks and uncertainties. The Company continually seeks to minimize its exposure to business risks, but by the nature of its business and exploration activities and size, will always have some risk. These risks are not always quantifiable due to their uncertain nature. Should one or more of these risks and uncertainties, including those described under the headings “Risks and Uncertainties” and “Cautionary Notes Regarding Forward-Looking Statements” materialize, or should underlying assumptions prove incorrect, then actual results may vary materially from those expressed or implied in forward-looking statements. The effective date of this report is May 12, 2023.

 

The technical content disclosed in this MD&A was reviewed and approved by Greg Matheson, P. Geo., Chief Operating Officer, and a Qualified Person as defined under National Instrument 43-101. Mr. Matheson consents to the publication of this MD&A, by NFG. The scientific and technical information in this MD&A relating to the Queensway Project is derived from, and in some instances is a direct extract from, and is based on the assumptions, qualifications and procedures set out in, the report entitled “January 2023 Exploration Update At New Found Gold Corp’s Queensway Gold Project in Newfoundland and Labrador, Canada” with an effective date of January 24th, 2023, prepared by R. Eccles P.Geo of Apex Geoscience in accordance with NI 43-101 (the “Queensway Technical Report”). Reference should be made to the full text of the Queensway Technical Report, which is available for review under the Company’s profile on SEDAR at www.sedar.com.

 

Description of Business

 

The Company was incorporated on January 6, 2016, under the Business Corporations Act (Ontario). On June 23, 2020, the Company continued as a British Columbia corporation under the Business Corporation Act in the province of British Columbia. The Company’s head office is located at WeWork c/o New Found Gold Corp., 1600 – 595 West Pender Street, Vancouver, British Columbia V7X 1L4, and its registered office is located at Suite 2600 – 595 Burrard Street, Vancouver, British Columbia V7X 1L3. On August 11, 2020, the Company completed an initial public offering and listed on the TSX Venture Exchange under the symbol “NFG”. On September 29, 2021, the Company also listed its shares on the NYSE American stock exchange under the symbol “NFGC”.

 

The Company is a mineral exploration company engaged in the acquisition, exploration and evaluation of resource properties with a focus on gold properties located in the Provinces of Newfoundland and Labrador and Ontario, Canada. The Company’s principal objective is to explore and develop the Queensway Project, which is located near Gander, Newfoundland and to identify other properties worthy of investment and exploration. For the purpose of NI 43-101, the Queensway Project is the Company’s only material property.

 

The Queensway Project is comprised of 94 mineral licenses, including 6,649 claims comprising 166,225ha of land located near Gander, Newfoundland. The Queensway Project is accessible by main access roads including the Trans-Canada Highway (“TCH”) that passes through the northern portion of the project and has high voltage electric transmission lines running through the project area.

 

 

- 1 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

In addition, the Company owns a 100% interest in the Lucky Strike project in Kirkland Lake, Ontario comprising 11,684ha, as well as a portfolio of mining and royalty interests throughout northeastern Ontario.

 

The Lucky Strike Property is located 10km north of Larder Lake, Ontario and is comprised of 644 single cell un-patented mining claims. The Company is well financed to advance its planned exploration activities on the projects as intended.

 

As of the date of this MD&A, the Company’s Board of Directors consisted of the following: Collin Kettell (Executive Chairman), Vijay Mehta, Denis Laviolette, Ray Threlkeld and Douglas Hurst.

 

Additional information relating to the Company is available on the Company’s website at www.newfoundgold.ca.

 

Project Summary

 

Queensway Project, Newfoundland

 

Ownership

 

The Queensway project consists of licences that were acquired through 1) online map staking with the Government of Newfoundland, 2) the successful completion of a series of Option Agreements (9 Option Agreements), and 3) as part of a current Option Agreement announced on November 3, 2022. Some licences were acquired via a direct purchase agreement. The optioned lands also carry various net smelter royalties which are summarized in the table below. The current Option Agreement increased the property package by 551 individual claims totalling 13,775ha and added 6.1km of strike length on the Appleton Fault Zone. In 2022, NFG conducted additional map staking adding 4 new claims and in early 2023 added 53 new claims expanding the Queensway project to 6,649 claims for a total of 166,225ha.

 

- 2 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Queensway Project mineral licence description and status (reported by blocks of contiguous licences/claims)

 

A)Queensway North Block

 

Licence No.  Title Holder  Location  No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
006821M  New Found Gold Corp.  Gander River, Central NL  2  0.50  Issued  1999-05-17  2023-05-17  2023-07-17  $4,591.50  2026-05-17  2.5  1.0
007984M  New Found Gold Corp.  Glenwood, Central NL  50  12.50  Issued  1998-11-13  2023-11-13  2025-01-13   N/A  N/A  0.4  0.0
022216M  New Found Gold Corp.  Glenwood, Central NL  6  1.50  Issued  2014-06-12  2024-06-12  2024-08-12  $6,731.36  2032-06-12  1.6  1.0
022491M  New Found Gold Corp.  Gander Lake Area, Central NL  12  3.00  Issued  2014-11-06  2024-11-06  2025-01-06  $13,227.96  2032-11-06  1.6  1.0
023720M  New Found Gold Corp.  Glenwood, Central NL  4  1.00  Issued  2001-12-31  2024-01-01  2024-02-29  $7,657.67  2026-12-31  1.0  0.0
023721M  New Found Gold Corp.  Glenwood, Central NL  2  0.50  Issued  2001-12-31  2024-01-01  2024-02-29  $1,522.60  2025-12-31  1.0  0.0
023804M  New Found Gold Corp.  Glenwood, Central NL  12  3.00  Issued  2001-02-19  2023-02-20  2023-04-20  $12,313.65  2026-02-19  1.6  1.0
023860M  New Found Gold Corp.  Joe Batts Brook, Central NL  11  2.75  Issued  2016-04-07  2026-04-07  2024-06-06  $10,953.23  2033-04-07  0.6  0.0
023861M  New Found Gold Corp.  Joe Batts Pond, Central NL  16  4.00  Issued  2016-04-07  2026-04-07  2024-06-06  $15,931.97  2033-04-07  1.0  0.0
023862M  New Found Gold Corp.  Joe Batts Brook, Central NL  4  1.00  Issued  2016-04-07  2026-04-07  2024-06-06  $3,982.99  2033-04-07  0.6  0.0
023863M  New Found Gold Corp.  Joe Batts Brook, Central NL  11  2.75  Issued  2016-04-07  2026-04-07  2024-06-06  $10,953.23  2033-04-07  1.0  0.0
023864M  New Found Gold Corp.  Joe Batts Brook, Central NL  3  0.75  Issued  2016-04-07  2026-04-07  2024-06-06  $2,987.24  2033-04-07  1.0  0.0
023866M  New Found Gold Corp.  Joe Batts Brook, Central NL  4  1.00  Issued  2016-04-07  2026-04-07  2024-06-06  $1,966.33  2033-04-07  1.0  0.5
023874M  New Found Gold Corp.  Joe Batts Brook, Central NL  8  2.00  Issued  2016-04-11  2026-04-13  2024-06-10  $7,965.98  2033-04-11  1.6  1.0
023875M  New Found Gold Corp.  Joe Batts Pond, Central NL  3  0.75  Issued  2016-04-12  2026-04-13  2023-06-12  $2,700.00  2029-04-12  1.6  1.0
023881M  New Found Gold Corp.  Joe Batts Brook, Central NL  7  1.75  Issued  2016-04-21  2026-04-21  2023-06-20  $6,300.00  2029-04-21  1.6  1.0
023916M  New Found Gold Corp.  Gander Lake Area, Central NL  4  1.00  Issued  2016-05-05  2026-05-05  2024-07-04  $3,982.99  2033-05-05  1.6  1.0
023962M  New Found Gold Corp.  The Outflow, Central NL  9  2.25  Issued  2016-05-19  2026-05-19  2024-07-18  $7,039.56  2033-05-19  1.6  1.0
023987M  New Found Gold Corp.  Joe Batts Pond Area, Central NL  11  2.75  Issued  2016-06-07  2026-06-08  2024-08-06  $5,407.41  2033-06-07  1.6  1.0
024026M  New Found Gold Corp.  Joe Batts Pond Area, Central NL  6  1.50  Issued  2016-06-30  2026-06-30  2024-08-29  $2,949.50  2033-06-30  1.6  1.0
024031M  New Found Gold Corp.  Joe Batts Pond Area, Central NL  6  1.50  Issued  2016-06-30  2026-06-30  2023-08-29  $5,400.00  2029-06-30  1.6  1.0
024136M  New Found Gold Corp.  Gander River Area, Central NL  25  6.25  Issued  2016-09-13  2026-09-14  2024-11-12  $30,000.00  2033-09-13  0.4  0.0
024138M  New Found Gold Corp.  Gander Lake, Central NL  21  5.25  Issued  2016-09-15  2026-09-15  2024-11-14  $25,200.00  2033-09-15  1.6  1.0
024139M  New Found Gold Corp.  Gander Lake, Central NL  30  7.50  Issued  2016-09-15  2026-09-15  2024-11-14  $36,000.00  2033-09-15  1.6  1.0
024140M  New Found Gold Corp.  Joe Batts Pond, Central NL  2  0.50  Issued  2016-09-15  2026-09-15  2024-11-14  $2,400.00  2033-09-15  1.6  1.0
024141M  New Found Gold Corp.  Joe Batts Pond Area, Central NL  2  0.50  Issued  2016-09-15  2026-09-15  2024-11-14  $2,400.00  2033-09-15  1.6  1.0
024264M  New Found Gold Corp.  Joe Batts Pond Area, Central NL  4  1.00  Issued  2016-10-24  2026-10-26  2024-12-23  $4,800.00  2033-10-24  0.4  0.0
024265M  New Found Gold Corp.  Appleton, Central NL  12  3.00  Issued  2016-10-24  2026-10-26  2024-12-23  $14,400.00  2033-10-24  0.4  0.0
024266M  New Found Gold Corp.  Joe Batts Pond, Central NL  128  32.00  Issued  2016-10-24  2026-10-26  2024-12-23  $12,677.96  2032-10-24  0.4  0.0
024268M  New Found Gold Corp.  Millers Brook, Central NL  56  14.00  Issued  2016-10-24  2026-10-26  2024-12-23  $37,446.05  2032-10-24  1.6  1.0
024997M  New Found Gold Corp.  Glenwood Area, Central NL  21  5.25  Issued  2017-04-27  2027-04-27  2024-06-26  $10,323.24  2033-04-27  1.6  1.0
025008M  New Found Gold Corp.  Gander Lake, Central NL  13  3.25  Issued  2017-05-04  2027-05-04  2024-07-03  $12,944.72  2033-05-04  1.0  0.0
026074M  New Found Gold Corp.  Joe Batts Brook, Central NL  3  0.75  Issued  2018-05-31  2023-05-31  2024-07-30  $2,087.24  2033-05-31  2.2  1.0
030714M  New Found Gold Corp.  King's Point, Gander Lake  8  2.00  Issued  2020-05-02  2025-05-02  2024-07-01  $6,710.45  2033-05-02  1.0  0.0
035198M  Suraj Amarnani  Fourth Pond  168  42.00  Issued  2022-10-11  2027-10-11  2024-01-09  $33,600.00  2023-11-10  0.0  0.0

 

- 3 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

B)Queensway South Block

 

Licence No.  Title Holder  Location  No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
022236M  New Found Gold Corp.  Southwest Gander River, Central NL  5  1.25  Issued  2014-06-12  2024-06-12  2023-08-11  $508.21  2023-06-12  1.0  0.5
022260M  New Found Gold Corp.  Southwest Gander River, Central NL  1  0.25  Issued  2014-06-13  2024-06-13  2024-08-12  $436.83  2024-06-13  1.0  0.5
022342M  New Found Gold Corp.  Southwest Gander River, Central NL  1  0.25  Issued  2014-08-25  2024-08-25  2024-10-24  $828.59  2025-08-25  1.0  0.5
023239M  New Found Gold Corp.  Pauls Pond, Central NL  2  0.50  Issued  2015-08-12  2025-08-12  2024-10-11  $1,187.57  2025-08-12  1.0  0.5
023495M  New Found Gold Corp.  Northwest Gander River, Central NL  5  1.25  Issued  2015-11-19  2025-11-19  2024-01-18  $2,448.69  2023-11-19  1.0  0.5
023498M  New Found Gold Corp.  Northwest Gander River, Central NL  8  2.00  Issued  2015-11-19  2025-11-19  2024-01-18  $3,882.09  2023-11-19  1.0  0.5
024435M  New Found Gold Corp.  Greenwood Pond, Central NL  7  1.75  Issued  2016-11-21  2026-11-23  2024-01-22  $1,428.47  2023-11-21  1.0  0.5
024436M  New Found Gold Corp.  Greenwood Pond, Central NL  3  0.75  Issued  2016-11-21  2026-11-23  2024-01-22  $1,277.65  2024-11-21  1.0  0.5
024557M  New Found Gold Corp.  Bear Pond, Central NL  250  62.50  Issued  2016-12-12  2026-12-14  2023-02-10  $105,663.21  2022-12-12  1.0  0.0
024558M  New Found Gold Corp.  Great Gull River, Central NL  239  59.75  Issued  2016-12-12  2026-12-14  2023-02-10  $100,989.75  2022-12-12  1.0  0.0
024559M  New Found Gold Corp.  Northwest Gander River, Central NL  256  64.00  Issued  2016-12-12  2026-12-14  2023-02-10  $116,036.32  2022-12-12  1.0  0.0
024560M  New Found Gold Corp.  Careless Brook, Central NL  121  30.25  Issued  2016-12-12  2026-12-14  2024-02-12  $63,185.40  2023-12-12  1.0  0.0
024561M  New Found Gold Corp.  Eastern Pond, Central NL  256  64.00  Issued  2016-12-12  2026-12-14  2023-02-10  $69,687.96  2022-12-12  1.0  0.0
024562M  New Found Gold Corp.  Hussey Pond, Central NL  241  60.25  Issued  2016-12-12  2026-12-14  2023-02-10  $109,210.11  2022-12-12  1.0  0.0
024563M  New Found Gold Corp.  Eastern Pond, Central NL  236  59.00  Issued  2016-12-12  2026-12-14  2023-02-10  $99,717.74  2022-12-12  1.0  0.0
024565M  New Found Gold Corp.  Gander Lake, Central NL  12  3.00  Issued  2016-12-12  2026-12-14  2023-02-10  $1,509.68  2022-12-12  1.0  0.0
024566M  New Found Gold Corp.  Gander Lake, Central NL  125  31.25  Issued  2016-12-12  2026-12-14  2023-02-10  $60,031.83  2022-12-12  1.0  0.0
024567M  New Found Gold Corp.  Gander Lake, Central NL  106  26.50  Issued  2016-12-12  2026-12-14  2023-02-10  $50,830.46  2022-12-12  1.0  0.0
024568M  New Found Gold Corp.  Birch Pond, Central NL  254  63.50  Issued  2016-12-12  2026-12-14  2023-02-10  $107,360.90  2022-12-12  1.0  0.0
024569M  New Found Gold Corp.  Southwest Gander River, Central NL  221  55.25  Issued  2016-12-12  2026-12-14  2023-02-10  $106,523.78  2022-12-12  1.0  0.0
024570M  New Found Gold Corp.  Dennis Brook, Central NL  117  29.25  Issued  2016-12-12  2026-12-14  2023-02-10  $49,185.49  2022-12-12  1.0  0.0
024571M  New Found Gold Corp.  Winter Brook, Central NL  153  38.25  Issued  2016-12-12  2026-12-14  2023-02-10  $15,598.82  2022-12-12  1.0  0.0
025766M  New Found Gold Corp.  Pauls Pond, Central NL  163  40.75  Issued  2016-12-12  2026-12-14  2023-02-10  $68,720.03  2022-12-12  1.0  0.0
030710M  New Found Gold Corp.  Little Dead Wolf Pond  144  36.00  Issued  2020-05-02  2025-05-02  2024-07-01  $33,831.05  2024-05-02  1.0  0.0
030716M  New Found Gold Corp.  Third Berry Hill Pond  224  56.00  Issued  2020-05-02  2025-05-02  2024-07-01  $46,121.42  2024-05-02  0.0  0.0
030722M  New Found Gold Corp.  Hunt's Pond  149  37.25  Issued  2020-05-02  2025-05-02  2024-07-01  $35,005.74  2024-05-02  1.0  0.0
030726M  New Found Gold Corp.  Joe's Feeder Cove  5  1.25  Issued  2020-05-02  2025-05-02  2024-07-01  $1,347.81  2027-05-02  1.0  0.0
030727M  New Found Gold Corp.  Dead Wolf Brook  195  48.75  Issued  2020-05-02  2025-05-02  2024-07-01  $40,150.35  2024-05-02  1.0  0.0
030733M  New Found Gold Corp.  Rocky Brook  173  43.25  Issued  2020-05-02  2025-05-02  2024-07-01  $35,620.56  2024-05-02  1.0  0.0
030737M  New Found Gold Corp.  Caribou Lake  247  61.75  Issued  2020-05-02  2025-05-02  2024-07-01  $50,857.12  2024-05-02  1.0  0.0
030739M  New Found Gold Corp.  Great Gull River  224  56.00  Issued  2020-05-02  2025-05-02  2024-07-01  $39,274.23  2024-05-02  1.0  0.0
030740M  New Found Gold Corp.  Ribbon Ponds  1  0.25  Issued  2020-05-02  2025-05-02  2024-07-01  $192.39  2024-05-02  0.0  0.0
030741M  New Found Gold Corp.  Southwest Gander River Cove  2  0.50  Issued  2020-05-02  2025-05-02  2024-07-01  $265.12  2025-05-02  1.0  0.0
030742M  New Found Gold Corp.  Steeles Brook  32  8.00  Issued  2020-05-02  2025-05-02  2024-07-01  $5,610.61  2024-05-02  1.0  0.0
030745M  New Found Gold Corp.  Dead Wolf Brook  101  25.25  Issued  2020-05-02  2025-05-02  2024-07-01  $20,795.83  2024-05-02  1.0  0.0
030746M  New Found Gold Corp.  Southwest Islands View  3  0.75  Issued  2020-05-02  2025-05-02  2024-07-01  $672.68  2026-05-02  1.0  0.0
030747M  New Found Gold Corp.  Owl Pond  37  9.25  Issued  2020-05-02  2025-05-02  2024-07-01  $7,618.27  2024-05-02  1.0  0.0
030748M  New Found Gold Corp.  Southwest Pond  140  35.00  Issued  2020-05-02  2025-05-02  2024-07-01  $28,825.88  2024-05-02  1.0  0.0
030752M  New Found Gold Corp.  Miguel's Lake  78  19.50  Issued  2020-05-02  2025-05-02  2024-07-01  $16,060.14  2024-05-02  1.0  0.0
030753M  New Found Gold Corp.  Gander Lake  3  0.75  Issued  2020-05-02  2025-05-02  2024-07-01  $37.68  2025-05-02  1.0  0.0
030754M  New Found Gold Corp.  Little Gander Lake  172  43.00  Issued  2020-05-02  2025-05-02  2024-07-01  $35,414.66  2024-05-02  0.0  0.0
030755M  New Found Gold Corp.  Rocky Brook  30  7.50  Issued  2020-05-02  2025-05-02  2024-07-01  $6,176.98  2024-05-02  0.0  0.0
030756M  New Found Gold Corp.  Southwest Pond  88  22.00  Issued  2020-05-02  2025-05-02  2024-07-01  $18,119.14  2024-05-02  1.0  0.0
030763M  New Found Gold Corp.  Rocky Brook  45  11.25  Issued  2020-05-02  2025-05-02  2024-07-01  $9,265.46  2024-05-02  0.0  0.0
030765M  New Found Gold Corp.  Berry Hill Brook  124  31.00  Issued  2020-05-02  2025-05-02  2024-07-01  $25,531.50  2024-05-02  0.0  0.0
030768M  New Found Gold Corp.  Gander Lake Prime  149  37.25  Issued  2020-05-02  2025-05-02  2023-07-03  $39,040.07  2023-05-02  1.0  0.0
030771M  New Found Gold Corp.  Northwest Gander River  37  9.25  Issued  2020-05-02  2025-05-02  2024-07-01  $7,618.27  2024-05-02  1.0  0.0
030783M  New Found Gold Corp.  Little Dead Wolf Brook  41  10.25  Issued  2020-05-02  2025-05-02  2024-07-01  $9,632.45  2024-05-02  0.0  0.0
035087M  New Found Gold Corp.  Gander Lake Prime  2  0.50  Issued  2022-10-13  2027-10-13  2023-12-12  $400.00  2023-10-13  0.0  0.0
035338M  New Found Gold Corp.  Gillingham's Pond  53  13.25  Issued  2023-01-05  2028-01-05  2024-03-05  $10,600.00  2024-01-05  0.0  0.0

 

C)Twin Ponds Block

 

Licence No.   Title Holder   Location   No. of
Claims
  Area
(km²)
  Status   Issued Date   Renewal Date   Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
024270M   New Found Gold Corp.   Island Pond, Central NL   107   26.75   Issued   2016-10-24   2026-10-26   2023-12-25   $ 13,350.26   2027-10-24   1.6   1.0
024274M   New Found Gold Corp.   Twin Ponds, Central NL   77   19.25   Issued   2016-10-24   2026-10-26   2023-12-25   $ 7,295.39   2027-10-24   1.6   1.0
035048M   Suraj Amarnani   Twin Ponds   42   10.50   Issued   2022-09-29   2027-09-29   2023-11-28   $ 8,400.00   2023-09-29   0.0   0.0

 

D)Ten Mile Duder Lake Block

 

Licence No.  Title Holder  Location  No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due Date  Annual Minimum Expenses  Expenses Due Date  NSR Royalty (% )  NSR Buyback Provision (% )
035047M  Aidan ONeil  Ten Mile-Duder Lake  209  52.25  Issued  2022-09-29  2027-09-29  2023-11-28  $41,800.00  2023-09-29  0.0  0.0
035050M  Josh Vann  Ten Mile Lake  2  0.50  Issued  2022-09-29  2027-09-29  2023-11-28  $400.00  2023-09-29  0.0  0.0

 

- 4 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

E)South Pond Block

 

Licence No.  Title Holder  Location  No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
035197M  Aidan ONeil  South Pond  130  32.50  Issued  2022-10-11  2027-10-11  2024-01-09  $26,000.00  2023-11-10  0.0  0.0
035209M  New Found Gold Corp.  South Pond  2  0.50  Issued  2022-11-10  2027-11-10  2024-01-09  $400.00  2023-11-10  0.0  0.0

 

F)Bellman’s Pond Block

 

Licence No.  Title Holder  Location   No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
030775M  New Found Gold Corp.  Bellman's Pond  1  0.25  Issued  2020-05-02  2025-05-02  2024-07-01  $221.43  2024-05-02  0.0  0.0

 

G)Little Rocky Brook Block

 

Licence No.  Title Holder  Location  No. of
Claims
  Area
(km²)
  Status  Issued Date  Renewal Date  Report Due
Date
  Annual
Minimum
Expenses
  Expenses Due
Date
  NSR
Royalty
(% )
  NSR
Buyback
Provision
(% )
030777M  New Found Gold Corp.  Little Rocky Pond, Gander River  114  28.50  Issued  2020-05-02  2025-05-02  2024-07-01  $26,782.91  2024-05-02  0.0  0.0

 

- 5 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Claim Groups

 

- 6 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

Queensway Project – Queensway North mineral licences, and the separate licences of Twin Ponds, Ten Mile-Duder Lake, South Pond, Bellman’s Pond, and Little Rocky Brook

 

- 7 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

Queensway Project – Queensway South mineral licences

 

- 8 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

Queensway Project – Locations of Gold Prospects

 

- 9 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Environmental and Exploration Permitting

 

NFG is responsible for obtaining all permits in accordance with the laws of Newfoundland and Labrador to conduct exploration activities at the Queensway Property. Exploration activities require approval from the Mineral Lands Division of the province’s Department of Industry, Energy, and Technology. These specify the activities that are allowed in the area; they are typically valid for one year and can be renewed.

 

The different permits and licence requirements in the province of Newfoundland and Labrador can include:

 

1.Exploration Approvals: An Exploration Approval Permit enables an exploration company to conduct prospecting, rock and soil geochemistry, line cutting, trenching, bulk sampling, airborne and/or ground geophysical surveys, fuel storage, ATV usage, diamond drilling, etc.

 

2.Water Use Licence: Activities that require water to be drawn from surface waterways or from aquifers require a Water Use Licence. These are typically valid for five years and can be renewed. These permits are no longer needed for drilling and trenching activities.

 

3.Licence to Occupy: Required if a camp location was to be used for a period longer than that which was allowed as part of the Exploration Approval Permit. This permit is obtained from the Provincial Department of Crown lands. These are typically valid for five years and can be renewed.

 

4.Section 39 Permit: When field activities occur within a Protected Public Water Supply Area (PPWSA), restoration requirements and constraints on field activities are stipulated in a “Section 39 Permit” that is typically valid for one year and can be renewed.

 

5.Section 48 Permit: If exploration activities include stream crossings and/or fording, or any work in and around any body of water, the Water Resources Management Division must be contacted to obtain a Section 48 Permit to Alter a Water Body under the Water Resources Act, 2002.

 

6.Forestry Permits: NFG shall contact the nearest Forest Management District Office to obtain the following permits prior to commencing any activity as required.

 

7.A commercial harvesting permit before the start of the exploration program if trees must be cut for access to exploration sites on Crown lands.

 

8.An operating permit if operations are to take place on forest land during the forest fire season (May-September).

 

9.During the forest fire season, a permit to burn must be obtained to ignite a fire on or within 300 m of forest land. NFG has never needed this permit.

 

10.Development Permit: Any activity that meets the definition of development under the Urban and Rural Planning Act, 2000, within a municipal planning area/boundary will require application and permit from the Municipality.

 

The table below summarizes the permits, licences and approvals that have currently been granted to NFG:

 

·Exploration Approvals (prefixed with E).
·Water Use Licences (prefixed with WUL).
·PPWSA Section 39 Permits (prefixed with PRO).
·Section 49 Permits to Alter a Water Body (prefixed with ALT).
·Other environmental permits.

 

- 10 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Mineral licences 024557M, 024558M, 024561M, 024563M, 024568M, and 024570M, all of which lie in the south of Queensway South, are restricted from exploration activities from mid-May to early-July as this area is a spring habitat for Newfoundland caribou.

 

Mineral licence 035198M in Queensway North encloses two known archaeological sites and covers a portion of the Gander River which has high archaeological potential. As such, the Provincial Archaeology Office recommends a 100 m buffer along the Gander River, and 50 m buffers around the two known sites. The two known archaeological sites in UTM Zone 21N NAD83 are: 1) 662938 m Easting, 5435800.33 m Northing and 2) 670038.33 m Easting, 5439264.60 m Northing.

 

With respect to title, mineral licences: 035047M and 035197M, 035048M and 035198M, and 035050M are owned by Aidan O’Neil, Suraj Amarnani, and Josh Vann respectively. Hence, NFG mineral rights ownership of these licence areas and the mineral occurrences that may occur within them are subject to successful completion of conditions of a single Option Agreement in place.

 

Environmental permits, licences, and approvals.

 

Project Infrastructure

 

The main access roads include the TCH that passes through the southern portion of the Appleton Fault Zone (“AFZ”) / Joe Batts Pond Fault Zone (“JBPFZ”) claim areas on the QWN, and the Northwest Gander (“NWG”) road that extends along the western portion of the property from the TCH just west of Glenwood, to the south and west of Gander Lake on QWS.

 

Gravel woods access roads originally built for the forestry industry, such as the AFZ access, the JBPFZ access, the JBP road and the roads to the east of the steel bridge across the NWG River and across the bridge to the east of the Southwest Gander River extend through most of the property, with areas in the extreme SE and SW the most difficult to access. The SW area is best accessed by woods roads from Route 360, the Baie D’Espoir highway, that leaves the TCH at Bishop’s Falls, approximately 70km to the west of Glenwood.

 

Transportation availability includes the international airport at Gander which has bush plane and helicopter bases, a helicopter base in Appleton and shipping through the ports of Lewisporte and Botwood, 25km and 70km to the west respectively, and north of the TCH, both with good harbours although problems with winter shipping due to sea and pack ice.

 

- 11 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Electricity is available from the NL provincial grid, which has three transmission lines through the Queensway Project as follows:

 

1)A 350 kV HVdc direct current line which passes through the approximate centre of QWS licences;

 

2)Two 138 kV HVac transmission lines to the north of the TCH crossing the AFZ and JBPFZ trends on the QWN licences;

 

3)A 69 kV HVac transmission line that approximately parallels the TCH to the north across the AFZ and JBPFZ trends on the QWN licences and follows the TCH and secondary routes.

 

Historical Work

 

There has been over 29,200 metres of core in 238 holes drilled historically on the Queensway Project by Noranda, Rubicon and various operators from the mid 1980’s through to 2012. Historical core drilling has primarily occurred north of Gander Lake along the two principal fault structures the AFZ and JBPFZ; the exploration drilling has been spread out amongst individual zones with drilling along 5km of the AFZ targeting the Lotto, Powerline, Cokes, Keats, Dome, Trench 26, Road, Knob, Letha and Grouse zones. Drilling at the JBPFZ has focussed along 3km targeting the Pocket Pond and H-Pond zones and one drill hole targeting the 798 Zone. Significantly lesser number of drill holes have also targeted zones south of Gander Lake including the Paul’s Pond showing, Aztec and A-Zone extension and the Goose zone.

 

Throughout the 1980’s through mid-2000’s various operators and prospectors have completed surface geochemical sampling including tills, soils and rock samples. This amounts to roughly 2,500 till samples, over 14,000 soil samples and 6,000 rock samples spread across the large district scale project with concentrations of work around the many showings in the Queensway license group. This work has identified a number of gold in soil or gold in till anomalies that have led to surface gold discoveries or have yet to be explained with follow up exploration. Several locations throughout the project have defined surface float samples containing high grade gold mineralization some of which have led to surface gold occurrences while other locations have not been adequately explored to trace them to source.

 

Various historical ground geophysical surveys have been conducted throughout the Queensway Project with most of this work concentrated either along the AFZ, JBPFZ or in the region of the Paul’s Pond and Greenwood Pond showings in the QWS claim group. Over 50 different geophysical surveys including VLF, EM, MAG and IP have covered ground-based grids throughout the Queensway Project. Various anomalies have been identified and often limited follow up exploration has occurred.

 

A significant number of surface trenches have been conducted at the project with over 330 trenches. Many of the historical trenches have targeted soil and till anomalies with only some of these reaching bedrock; often the trenches not reaching bedrock have left both soil and till anomalies unexplained and open for further interpretation and exploration.

 

Project Geology

 

The Queensway Project is located within the Exploits subzone of the Dunnage zone and lies just to the west of the Gander River Ultramafic Complex (“GRUC”) fault, which is the Dunnage-Gander zones boundary. See figure below:

 

- 12 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 


Queensway Project – Geological context of the Queensway Project Geological map from Colman-Sadd et al., 1990.

 

- 13 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project- Integrated geological map of lithology, shear zones and gold showings in Queensway North.

 

It mostly comprises Cambrian to Silurian meta-sedimentary rocks of the Davidsville group (Williams et al., 1988; Colman-Sadd et al., 1990; Valverde-Vaquero et al., 2006; van Staal, 2007; O’Reilly et al., 2010). The Davidsville group is divided into the Outflow Formation and the Hunt’s Cove Formation. The property south of Gander Lake also includes the boundary between the Davidsville and Indian Island groups. The latter mainly comprises Silurian siliciclastic rocks, intruded by the Mount Peyton Intrusive suite.

 

There are over 100 gold showings/occurrences on and around the Queensway Project however the most notable mineralized zones in the Queensway Project are the JBPFZ which includes the H-Pond, Pocket Pond, Glass, Logan and Lachlan showings and the AFZ which includes the Dome, Little, Knob, Letha, Lotto, Grouse, Road, Bullet, Trench 26, Cokes, Powerline, Keats and Bowater showings.

 

- 14 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

A number of gold mineralized occurrences also occur within the QWS claim group including the Greenwood Pond, Hornet, North Pauls Pond, Aztec, Goose, Road Gabbro and LBNL showings.

 

Recent Exploration

 

Queensway Drill Program

 

On August 17, 2020, the Company announced it had initiated a 100,000m HQ-size diamond drilling program at the Queensway Project. The Company announced on January 6, 2021, that it has now increased the drilling program started in 2020 to a total of 200,000m; this program was further expanded on October 15, 2021, to 400,000m and once again on January 3, 2023, to 500,000m; this program is ongoing, and the Company currently has 10 drills operating in Q1, 2023.

 

In 2020, the Company completed 66 drill holes for a total of 13,400m that expanded the Keats zone and lead to the discovery of Lotto and Golden Joint zones.

 

In 2021, the Company completed an additional 391 drill holes totalling 117,043m largely focused on expanding Keats, Golden Joint, Lotto, 1744 and Pocket Pond zones.

 

In 2022, a total of 187,770m was completed in 676 holes that lead to the discoveries of Keats North, Keats West, Lotto North and further expanded Keats, Golden Joint and Lotto zones in addition to continued systematic testing along the Appleton Fault Zone. The Company has also completed a regional diamond drilling program designed to test high-priority targets at both Twin Ponds and QWS projects; both programs are the first phase of drilling completed by the Company, assays are pending for QWS.

 

The current drilling program is designed to test multiple exploration targets and zones along the 9.45km of the Appleton Fault Zone and 12km of the JBP Fault Zone at Queensway North. The primary focus is on the expansion of known zones of mineralization and systematic drilling within the prospective corridor surrounding the Appleton Fault Zone to identify new zones of gold mineralization. Meters will also be allocated to regional programs at both QWS and the newly optioned VOA property that added an additional 6.1km of strike on the Appleton Fault Zone. Diamond drilling programs will test drill-ready targets generated through various exploration activities that have been ongoing over the past few years and follow-up on the results of the 2022 drill program.

 

The majority of drilling to date has occurred along the Appleton Fault Zone with drill counts ranging from 10-15 and a year-to-date total of 397,298m completed in 1,478 holes. The breakdown of meters drilled to date is as follows: 393 drill holes at the Keats prospect totalling 117,896m, 97 holes at the Keats North prospect totalling 27,530m, 123 holes at the Keats West prospect totalling 26,869m, 75 holes at Iceberg prospect totalling 20,889m, 96 holes at the Golden Joint prospect totalling 29,491m, 107 drill holes at the Lotto prospect totalling 28,759m, 61 drill holes at Lotto North prospect totalling 14,877m, 58 drill holes at the Max Millions prospect totalling 12,905m, 32 drill holes at the Zone 36/K2 prospect totalling 7,852m, 46 holes at the Everest prospect totalling 12,844m and 52 drill holes at the TCH prospect totalling 15,387m, with the balance of 213 drill holes totalling 50,104m completed at other zones/targets along the Appleton Fault including the Knob, Cokes, Little-Powerline, Road, Dome and Big Dave.

 

The Company has also completed follow-up drilling along the JBP Fault Zone with 85 holes totalling 23,135m completed to date at the 798, 1744 and Pocket Pond prospects.

 

A first phase of drilling on the Queensway South Project consisting of 33 holes totalling 7,255m is complete and assays are pending. The exploration drilling program was designed to test a variety of targets in and around Paul’s Pond, Goose, Eastern Pond and Greenwood #2 prospects; assays are pending. A first phase of drilling was also completed on the Twin Ponds property consisting of 1,508m in 7 diamond drill holes testing early-stage exploration targets.

 

- 15 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project –Knob to Everest plan map (May 10, 2023)

 

- 16 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Keats Zone Drilling

 

To date the Company has focussed significant drilling efforts at the Keats Zone where a discovery hole in late 2019 (NFGC-19-01) was drilled. Several significant gold assay intercepts have been encountered within multiple individual zones at Keats.

 

The Keats Main Zone continues to see a steady increase in both strike length and depth with the results reported on October 18, 2022, extending the Keats Main Zone over a strike length of 1km with the intervals of 12.9 g/t Au over 2.10m in NFGC-22-527B and 45.1 g/t Au over 2.25m in NFGC-22-550. This deeper drilling program was initiated as follow-up to the high-grade intercept of 62.3 g/t Au over 2m in NFGC-21-387 reported on February 24, 2022. Subsequent drilling not only increased the strike length of the Keats Main Zone hosted within the Keats-Baseline Fault Zone (‘KBFZ’) to 1km but has also proven that it continues to depths of at least 400m vertical and contains supplementary broad domains of low-grade gold mineralization and high-grade gold mineralization as demonstrated by the intervals of 2.79 g/t Au over 12.35m in NFGC-22-600 (reported on October 18, 2022) and 25.3 g/t Au over 2.45 g/t Au and 72.7 g/t Au over 2.20 in NFGC-22-774 (reported on January 18, 2023). Additional highlight intercepts reported up-plunge and along strike within the Keats Main Zone include 21.4 g/t Au over 8.05m and 14.9 g/t Au over 12.85m in NFGC-21-204 (reported on June 15, 2021), 21.1 g/t Au over 7.20m in NFGC-21-464 (reported on April 11, 2022), 124.4 g/t Au over 17.70m in NFGC-20-59 (reported on May 4, 2021), 9.12 g/t Au over 8.20m and 42.6 g/t Au over 11.75m in NFGC-22-593 (reported on June 6, 2022) and the discovery hole, NFGC-19-01 yielding 86.2 g/t Au over 20.50m (reported on January 28, 2020).

 

Advancements in the 3-D model demonstrate that the Keats-Baseline Fault Zone forms an extension damage zone consisting of a multitude of fault and vein arrays that host high-grade gold mineralization. Exploration drilling continues to identify new high-grade veins and associated fault-zones and expand on previous discoveries such as:

 

-continued definition on the Keats Main high-grade domain at depth with intercepts 56.7g/t Au over 2.45m in NFGC-21-407 (reported on January 13, 2022), 28.2 g/t Au over 4.50m in NFGC-21-413A (reported on January 26, 2022), 28.3 g/t Au over 2.05m in NFGC-22-608 and 68.2 g/t Au over 2.05m in NFGC-22-616 (reported on October 18, 2022);
-delineation of high-grade gold up-dip of the core dilational zone within the Keats-Baseline Fault Zone with intercepts of 55.6 g/t Au over 3.20m in NFGC-21-385 (reported on March 2, 2022), located at surface and 200m up-dip, intercept 10.7 g/t Au over 3.15m in NFGC-21-306 (reported on March 2, 2022) and located 75m up-dip, and 55.1 g/t Au over 5.10m in NFGC-21-448 (reported on June 6, 2022) located 95m up-dip;
-the near surface discovery of the “421 Zone”, a gold-bearing, southwest-dipping structure at the south end of Keats, defined by intercepts 4.49 g/t Au over 3.55m and 7.85 g/t Au 4.85m in NFGC-21-421 (reported on April 11, 2022) and 4.31 g/t Au over 2.25m and 2.58 g/t Au over 10.40m in NFGC-21-467 (reported on April 11, 2022); 11.2 g/t Au over 2.10m in NFGC-22-486 (reported on June 6, 2022), 10.5 g/t Au over 2.30m in NFGC 22-733 (reported on January 18, 2023) and 4.59 g/t Au over 11.50m in NFGC-22-845 (reported on January 18, 2023);
-the footwall (the area between the Keats-Baseline Fault and the AFZ) intercepts of 119.5 g/t Au over 2.40m in NFGC-21-375 and 6.66 g/t Au over 5.90m in NFGC-21-342, both reported on April 11, 2022; and
-the intercepts of 9.35 g/t Au over 2.70m in NFGC-21-254 and 7.21 g/t over 5.75m in NFGC-21-392 and 79.8 g/t Au over 3.00m in NFGC-22-491 that occur within three distinct structures that are adjacent to and crosscut the Keats Main Zone, all reported on April 11, 2022.

 

2022 and 2023 assay results have been reported in press release dated January 13, 2022; January 26, 2022; February 24, 2022; March 2, 2022; April 11, 2022; April 13, 2022, May 4, 2022, June 6, 2022, August 2, 2022, September 1, 2022, September 27, 2022, and October 18, 2022, November 16, 2022, and January 18, 2023, found through SEDAR.

 

- 17 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Highlighted assay values and drill hole locations from Keats drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t) Zone
NFGC-21-254 136.85 139.55 2.70 9.35 Keats HW
Including 138.6 139.55 0.95 22.70
NFGC-21-392 47.15 52.90 5.75 7.21 Keats HW
Including 47.15 48.70 1.55 20.59
NFGC-21-256A 127.15 129.40 2.25 15.07 Keats Main
And 157.00 166.75 9.75 47.82
Including 158.00 161.65 3.65 125.49
NFGC-21-263 189.70 195.25 5.55 28.16 Keats Main
Including 193.10 195.25 2.15 71.86
NFGC-21-272 152.00 155.10 3.1 43.78 Keats Main
NFGC-21-297 219.5 227.75 8.25 8.79 Keats Main
Including 219.5 224.35 4.85 14.29
NFGC-21-306 113.85 117.00 3.15 10.66 Keats Main
NFGC-21-318 141.00 143.00 2.00 16.03 Keats Main
Including 141.00 142.00 1.00 31.60
NFGC-21-364A 216.25 218.30 2.05 56.3 Keats Main
Including 217.05 217.85 0.80 140.5
NFGC-21-376 191.00 193.05 2.05 13.65 Keats Main
NFGC-21-385 69.60 72.80 3.20 55.61 Keats Main
NFGC-21-387 444.40 446.40 2.00 62.30 Keats Main
NFGC-21-388 123.00 128.65 5.65 9.0 Keats Main
Including 126.95 128.30 1.35 31.5
NFGC-21-407 393.55 396.00 2.45 56.69 Keats Main
NFGC-21-413A 463.05 467.55 4.50 28.20 Keats Main
Including 463.05 466.00 2.95 41.02
NFGC-21-448 200.50 205.60 5.10 55.1 Keats Main
Including 200.50 200.95 0.45 609.0
NFGC-21-464 138.00 145.20 7.20 21.12 Keats Main
Including 139.55 141.80 2.25 61.36
NFGC-21-466 169.70 172.05 2.35 10.9 Keats Main
NFGC-22-491 92.00 95.00 3.00 79.81 Keats Main
Including 92.45 94.35 1.90 124.56
NFGC-22-527B 433.00 435.10 2.10 12.87 Keats Main
Including 433.00 434.00 1.00 26.80
NFGC-22-550 444.45 446.70 2.25 45.05 Keats Main
Including 444.45 445.00 0.55 181.50
NFGC-22-593 8.80 17.00 8.20 9.12 Keats Main
Including 11.15 11.45 0.30 25.9
Including 13.80 14.80 1.00 32.4
Including 16.20 16.60 0.40 55.3
And 20.50 32.25 11.75 42.59
Including 20.50 21.00 0.50 111
Including 21.90 22.20 0.30 338
Including 22.90 23.30 0.40 733
Including 29.60 30.10 0.50 25.8
Including 31.35 32.25 0.90 21.8
NFGC-22-608 255.95 258.00 2.05 28.33 Keats Main
NFGC-22-616 265.20 267.25 2.05 68.19 Keats Main
Including 265.60 266.50 0.90 153.50

 

- 18 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

NFGC-22-672 54.65 56.80 2.15 56.83 Keats Main
Including 55.10 55.55 0.45 270.00
NFGC-22-705 26.40 32.05 5.65 85.67 Keats Main
Including 28.90 30.50 1.60 298.93
And 51.50 60.55 9.05 13.42
Including 52.05 53.20 1.15 47.19
And Including 54.80 56.10 1.30 40.74
NFGC-22-774 364.00 366.45 2.45 25.31 Keats Main
Including 365.00 366.00 1.00 60.50
And 379.80 382.00 2.20 72.66
Including 379.80 380.35 0.55 290.00
NFGC-21-342 138.65 144.55 5.90 6.66 Keats FW
Including 142.00 143.00 1.00 30.60
NFGC-21-375 181.60 184.00 2.40 119.45 Keats FW
Including 182.20 182.70 0.50 570.71
NFGC-21-421 19.00 22.55 3.55 4.49 421
And 26.30 31.15 4.85 7.85
Including 28.60 29.50 0.90 35.51
NFGC-21-467 66.15 68.40 2.25 4.31 421
Including 67.00 67.60 0.60 13.85
And 70.00 80.40 10.40 2.58
NFGC-22-486 35.90 38.00 2.10 11.2 421
Including 36.60 37.30 0.70 32.0
And 371.40 373.60 2.20 10.1
Including 371.75 372.45 0.70 30.0
NFGC-22-733 22.30 24.60 2.30 10.45 421
Including 22.80 23.30 0.50 46.80
NFGC-22-845 115.00 129.90 14.90 4.59 421
Including 120.00 121.00 1.00 26.17
Including 129.00 129.90 0.90 11.50

 

1At Keats Main, host structures are interpreted to be steeply dipping and true widths are generally estimated to be 60% to 95% of the reported intervals with exceptions being holes NFGC-21-407, NFGC-21-413A, NFGC-22-672 and NFGC-22-705 where true widths can be as low as 20% of the reported interval. At 421, Keats HW and Keats FW, true widths are generally estimated to be 20-95% of reported intervals. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No.  Azimuth (°) Dip (°) Length (m) UTM E UTM N
NFGC-21-254 299 -45.5 293 658119 5427290
NFGC-21-256A 298.5 -46 257 658197 5427374
NFGC-21-263 118 -72 334 657952 5427310
NFGC-21-272 298.5 -45.5 227 658187 5427380
NFGC-21-297 300 -45 377 658126 5427228
NFGC-21-306 299 -45.5 179 658100 5427358
NFGC-21-318 300 -45 200 658089 5427335
NFGC-21-342 300 -45 260 658018 5427377
NFGC-21-364A 120 -80 299 657971 5427338
NFGC-21-375 300 -45 278 658011 5427352
NFGC-21-376 120 -72 351 657972 5427337
NFGC-21-385 299 -45.5 290 657960 5427266
NFGC-21-387 299 -45.5 635 657936 5426877

 

- 19 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

NFGC-21-388 120 -71 242 657988 5427370
NFGC-21-392 300 -42 281 657939 5427279
NFGC-21-407 296 -57 467 658109 5427123
NFGC-21-413A 296 -57 515 658086 5427134
NFGC-21-421 325 -56 452 657830 5427099
NFGC-21-448 299 -45.5 329 658074 5427257
NFGC-21-464 299 -45.5 320 658193 5427391
NFGC-21-466 300 -45 338 657943 5427161
NFGC-21-467 325 -56 494 657825 5427070
NFGC-22-486 30 -65 419 657815 5427088
NFGC-22-491 299 -45.5 206 658300 5427503
NFGC-22-527B 294 -47.5 731 657945 5426843
NFGC-22-550 297 -46 557 657887 5426789
NFGC-22-593 300 -45 119 658214 5427523
NFGC-22-608 87 -79 304 657921 5427260
NFGC-22-616 60 -81 299 657921 5427260
NFGC-22-672 133 -70 213 658052 5427473
NFGC-22-705 131 -68 219 658028 5427429
NFGC-22-733 354 -66 485 657841 5427082
NFGC-22-774 300 -45 458 657770 5426683
NFGC-22-845 300 -45 216 657767 5426977

 

The latest drilling results are shown on the long section, plan map and cross sections below:

 

 

 

Queensway Project – Long section of Keats North, Keats Main and TCH zones, looking west (January 18, 2023)

 

- 20 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Keats plan view map (March 2, 2023)

 

- 21 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Keats cross-section (B-B’), looking northeast, +/- 12.5m (October 18, 2022)

 

 

 

Queensway Project – Keats cross-section (C-C’), looking northeast, +/- 12.5m (October 18, 2022)

 

- 22 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Keats North Drilling

 

Reconnaissance drilling working in the highly prospective region between the Keats Main and Golden Joint zones (“Keats North”) intersected significant mineralization, now named the “515 Zone”, returning initial intercepts of 9.21 g/t Au over 2.15m and 43.9 g/t Au over 3.85m in NFGC-22-515 (reported on April 13, 2022) approximately 440m north of the Keats Main Zone. Following this discovery, reconnaissance drilling in this region identified additional near-surface high-grade gold mineralization with the intercept of 275 g/t Au over 2.15 m in NFGC-22-538 (reported on May 4, 2022) which occurs at a vertical depth of 22m adjacent to the AFZ and is approximately 65m north of the Keats Zone.

 

On August 2, 2022, the company announced results from continued exploration in the Keats North target region defining multiple high-grade veins that define a corridor over a strike length of approximately 630m x 150m wide linking up the north end of Keats with the 515 Zone. Noteworthy intervals in these veins include 45.9 g/t Au over 2.75m in NFGC-22-578 (Umbra), 19.3 g/t Au over 2.05m in NFGC-22-610 (Umbra), 40.6 g/t Au over 2.00m in NFGC-22-586 (Enigma), 24.1 g/t Au over 2.20m in NFGC-22-580 (Enigma) and 13.2 g/t Au over 2.05m and 10.7 g/t Au over 2.70m in NFGC-22-559 (Enigma).

 

Ongoing exploration work at the Keats North prospect further defined this complex network of gold-bearing veins and associated structures largely focussed on expanding mineralization to depths of up to 200m vertical at Enigma, Umbra and Penumbra with additional highlight intervals of 18.95 g/t Au over 5.75m in NFGC-22-665 (reported on September 1, 2022), 117 g/t Au over 2.00m in NFGC-22-728 (reported on December 5, 2022), 36.5 g/t Au over 2.15m in NFGC-22-762 (reported on December 5, 2023), 7.63 g/t Au over 5.25m in NFGC-22-700 (reported on December 5, 2022), 28.8 g/t Au over 3.45m in NFGC-22-855 (reported on January 24, 2023), 18.2 g/t Au over 2.65m in NFGC-22-901(reported on April 18, 2023), 14.4 g/t Au over 2.10m in NFGC-22-880 (reported on April 18, 2023) and 16.0 g/t Au over 2.50m and 10.8 g/t Au over 2.15m in NFGC-22-852 (reported on April 18, 2023).

 

These significant intervals along with many others occur largely within and around the Umbra, Penumbra, and Enigma structures, see figure below, however, others fall outside into new structural splays; these zones remain open. A combination of systematic and targeted drilling is being used to test this area and expand on several gold domains identified to date with a focus on the top 200m of vertical depth.

 

On January 24, 2023, the Company reported a new vein intersected midway between Keats North and Golden Joint reporting 50.3 g/t Au over 2.45m in NFGC-22-766, follow-up drilling is required.

 

2022 and 2023 assay results have been reported in press release dated April 13, 2022, May 4, 2022, August 2, 2022, September 1, 2022, December 5, 2022, January 24, 2023, and April 18, 2023, found through SEDAR.

 

Hole No. From (m) To (m) Interval (m) Au (g/t)
NFGC-22-5151 198.50 200.65 2.15 9.21
Including 199.25 199.75 0.50 38.9
And3 209.00 212.85 3.85 43.9
Including 209.00 210.65 1.65 76.0
Including 211.35 212.35 1.00 43.1
NFGC-22-5382 32.45 34.60 2.15 275
Including 33.10 33.90 0.80 738
NFGC-22-5593 131.95 134.00 2.05 13.2
Including 133.00 134.00 1.00 24.7
And3 148.00 150.70 2.70 10.7
Including 148.00 149.70 1.70 14.9
NFGC-22-5701 23.60 26.20 2.60 10.72
Including 25.00 26.20 1.20 22.8
NFGC-22-5774 34.20 36.80 2.60 12.9
Including 36.15 36.80 0.65 48.9
NFGC-22-5783 22.55 25.30 2.75 45.9

 

- 23 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Including 22.55 23.35 0.80 142.0
NFGC-22-5801 52.00 54.20 2.20 24.1
Including 53.20 53.70 0.50 105.5
NFGC-22-5863 48.00 50.00 2.00 40.6
Including 49.45 50.00 0.55 147.5
NFGC-22-6101 46.55 48.60 2.05 19.3
Including 47.75 48.30 0.55 65.6
NFGC-22-6652 46.6 52.35 5.75 18.95
Including 48.25 48.85 0.6 162.5
NFGC-22-7003 165.90 171.15 5.25 7.63
Including 168.95 170.55 1.60 18.82
NFGC-22-7282 249.20 251.20 2.00 116.93
Including 250.15 250.80 0.65 358.07
NFGC-22-7541 118.00 122.25 4.25 5.68
Including 118.00 118.80 0.80 14.30
Including 121.50 122.25 0.75 11.65
NFGC-22-7623 52.50 54.65 2.15 36.49
Including 53.35 54.00 0.65 115.00
NFGC-22-7662 206.85 209.30 2.45 50.30
Including 207.20 208.15 0.95 129.50
NFGC-22-7963 230.95 235.10 4.15 7.41
Including 230.95 231.45 0.50 35.90
Including 234.50 235.10 0.60 10.20
And3 240.40 242.65 2.25 17.06
Including 240.40 241.40 1.00 38.10
NFGC-22-8133 22.00 36.10 14.10 2.13
Including 22.55 23.60 1.05 15.67
NFGC-22-8253 120.00 122.00 2.00 20.82
Including 120.00 121.00 1.00 41.33
And3 140.00 142.00 2.00 4.07
And3 198.30 200.85 2.55 11.55
Including 199.90 200.85 0.95 30.91
NFGC-22-8523 161.95 164.45 2.50 16.00
Including 162.90 163.45 0.55 69.10
And3 171.50 173.65 2.15 10.76
Including 172.50 173.05 0.55 40.50
NFGC-22-8553 117.55 121.00 3.45 28.82
Including 117.55 118.65 1.10 85.85
NFGC-22-8802 173.75 175.85 2.10 14.43
Including 174.50 174.95 0.45 64.00
NFGC-22-9013 181.65 184.30 2.65 18.17
Including 182.80 183.20 0.40 98.70

 

Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 170% to 95%, 240% to 70% and, 310% to 40% of reported intervals. 4 True widths are unknown at this time. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

- 24 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N
NFGC-22-515 299 -45.5 281 658344 5428026
NFGC-22-538 300 -45 386 658193 5427710
NFGC-22-559 300 -45 333 658233 5427628
NFGC-22-570 300 -45 72 658199 5427720
NFGC-22-577 300 -45 260 658244 5427852
NFGC-22-578 300 -45 117 658258 5427556
NFGC-22-580 300 -45 110 658188 5427698
NFGC-22-586 300 -45 332 658162 5427669
NFGC-22-610 300 -45 312 658283 5427571
NFGC-22-665 300 -45 159 658226 5427762
NFGC-22-700 300 -45 374 658204 5427616
NFGC-22-728 300 -45 260 658237 5427597
NFGC-22-754 120 -45 134 658092 5427940
NFGC-22-762 300 -45 245 658261 5427727
NFGC-22-766 230 -45 327 658523 5428283
NFGC-22-796 300 -45 353 658218 5427580
NFGC-22-813 300 -62 158 658243 5427825
NFGC-22-825 300 -45 443 658126 5427602
NFGC-22-855 300 -45 410 658180 5427572

 

A selection of highlight drilling results is shown in the inclined 3-D image below for Keats North:

 

 

 

Queensway Project – Keats, Keats West, and Keats North inclined 3-D plan view map (December 5, 2023)

 

- 25 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Iceberg Drilling

 

On March 1, 2023, the Company announced the discovery of a new zone, “Iceberg”.  This zone is found along the highly prolific Keats-Baseline Fault Zone (“KBFZ”), the structure that is host to the Keats Main Zone. Iceberg shares a similar orientation to Keats Main and is comprised of a multitude of intersecting veins concentrating high-grade gold mineralization. Geological characteristics of Iceberg are nearly identical to those observed at Keats Main and the Company’s current interpretation is that Iceberg is the eastern continuation of Keats Main that has been displaced by faulting.

 

This new discovery is at surface and spans a current strike length of 50m and remains open in all directions and to depth. Drilling collared into mineralization in NFGC- 22-1084 with 15.3 g/t Au over 10.75m, while a 25m step-out south intersected 72.2 g/t Au over 9.65m in NFGC-23-1100, and a 25m step-out north intersected 19.7 g/t Au over 5.65m in NFGC-23-1109 (all reported on March 1, 2023). All three intercepts are shallow, occurring at depths of less than 30m from surface. Stepping down 25m from this fence of three discovery holes, drilling then intersected 49.7 g/t Au over 29.85m and 14.6 g/t Au over 3.80m in NFGC-23-1120 (released March 13, 2021) followed by the expansion of this zone down-dip to 80m with intervals 13.1 g/t Au over 13.90m and 12.6 g/t Au over 7.60m in NFGC-23-1128and 35.6 g/t Au over 10.65m, 6.88 g/t Au over 20.35m and 10.5 g/t Au over 6.65m in NFGC-23-1141 both reported on April 4, 2023.

 

As a result of this new interpretation and the continued success of tracking Iceberg down-dip and along strike, additional drills have been mobilized to this area to aggressively explore the along strike and down-dip potential of the KBFZ. Several holes at Iceberg are pending assay.

 

2023 assay results have been reported in press release dated March 1, 2023, March 13, 2023, and April 4, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from Iceberg drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m) Au (g/t) Zone
NFGC-22-10841 7.70 18.45 10.75 15.27 Iceberg
Including 12.40 13.25 0.85 128.29 Iceberg
Including 14.90 15.75 0.85 20.25 Iceberg
Including 16.15 16.75 0.60 22.11 Iceberg
NFGC-23-11001 36.35 46.00 9.65 72.15 Iceberg
Including 36.35 38.20 1.85 229.48 Iceberg
Including 38.95 39.95 1.00 18.63 Iceberg
Including 41.25 42.10 0.85 13.15 Iceberg
Including 43.45 45.40 1.95 119.63 Iceberg
NFGC-23-11091 17.60 23.25 5.65 19.65 Iceberg
Including 19.00 21.00 2.00 50.52 Iceberg
NFGC-23-11201 53.55 57.35 3.80 14.60 Iceberg
Including 55.75 56.70 0.95 54.50 Iceberg
And1 63.20 93.05 29.85 49.65 Iceberg
Including 63.70 64.75 1.05 56.11 Iceberg
Including 65.75 66.95 1.20 19.63 Iceberg
Including 67.55 68.55 1.00 31.90 Iceberg
Including3 73.10 77.45 4.35 183.28 Iceberg
Including3 78.85 80.35 1.50 31.13 Iceberg
Including3 83.75 84.55 0.80 14.65 Iceberg
Including3 85.55 86.40 0.85 25.50 Iceberg
Including3 90.10 93.05 2.95 158.00 Iceberg
NFGC-23-11282 61.60 69.20 7.60 12.62 Iceberg

 

- 26 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Including 67.55 68.50 0.95 91.30 Iceberg
And1 82.10 96.00 13.90 13.09 Iceberg
Including 86.00 88.00 2.00 67.00 Iceberg
Including 88.95 89.60 0.65 44.50 Iceberg
NFGC-23-11412 109.25 129.60 20.35 6.88 Iceberg
Including 117.00 117.60 0.60 10.65 Iceberg
Including 121.40 121.80 0.40 73.10 Iceberg
Including 126.10 126.55 0.45 25.70 Iceberg
Including 128.60 129.60 1.00 66.30 Iceberg
And3 138.85 149.50 10.65 35.58 Iceberg
Including 138.85 140.35 1.50 232.40 Iceberg
Including 143.35 144.10 0.75 20.20 Iceberg
And4 205.35 212.00 6.65 10.47 Iceberg
Including 206.00 206.70 0.70 32.00 Iceberg
Including 209.50 211.10 1.60 24.55 Iceberg

 

Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 160% to 95%, 255% to 85%,320% to 50% and 410% to 40% of reported intervals. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness. Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 155-85%, 265-95%, 320-50%, and 410-40% of reported intervals.

 

Hole number Azimuth Dip Length (m) UTM E UTM N Prospect
NFGC-22-1084 300 -45 62 658429 5427833 Iceberg
NFGC-23-1100 300 -45 140 658423 5427806 Iceberg
NFGC-23-1109 300 -45 116 658466 5427840 Iceberg
NFGC-23-1120 300 -45 191 658443 5427794 Iceberg
NFGC-23-1128 299 -45 236 658463 5427784 Iceberg
NFGC-23-1141 300 -45 297 658488 5427769 Iceberg

 

- 27 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest drilling results from Iceberg are shown on the plan map, long-section and cross-section below:

 

 

 

Queensway Project – Plan view map of Keats, Keats North, Iceberg and Keats West zones (April 25, 2023)

 

- 28 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Long section of Keats Main and Iceberg zones, looking northwest (April 4, 2023)

 

- 29 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Iceberg cross-section view, +/-12.5m, looking northwest (April 18, 2023)

 

Keats West Drilling

 

A combination of reconnaissance drilling and targeted drilling looking for the potential extension of the Penumbra vein in the hangingwall to the AFZ (west side) intersected significant mineralization in NFGC-22-533 reporting 8.70 g/t Au over 6.75m (reported on May, 4, 2022) followed by 17.9 g/t Au over 4.20m in NFGC-22-681 and 10.4 g/t Au over 10.50m in NFGC-22-686 (reported on September 27, 2022).

 

Ongoing exploration drilling at Keats West has uncovered a significant structure that is interpreted to be a thrust fault that dips gently to the south-southwest and hosts both low and high-grade gold mineralization over a considerable thickness with cumulative widths ranging from 10-50 m. This fault zone occurs on the west side of the AFZ, is hosted by an interbedded sequence of black siltstone, siltstone, and greywacke, and contains a series of stacked veins that contain the gold mineralization and represents an important new discovery for the Company.

 

The mineralization style is epizonal and typical of the other gold prospects found along this segment of the AFZ. Drilling has now intersected significant mineralization over an area that is 250m wide x 305m down-dip with broader intervals of mineralization spanning up to 80m as demonstrated by NFGC-22-833 that had an aggregate result of 1.94 g/t Au over 79.75m. Recent results published on March 21, 2023, exhibited good continuity of both low and high-grade mineralization within the host structure with the intervals of 10.1 g/t Au over 22.50 in NFGC-22-945 occurring 305m down-dip of previously reported 18.6 g/t Au over 15.95m in NFGC-22-773 (reported on November 23, 2023), and 100m down-dip of previously reported 42.6 g/t Au over 32.00m in NFGC-22-960 (reported on November 28, 2022). Additional infill results of 4.27 g/t Au over 31.55m in NFGC-22-911, 8.42 g/t Au over 4.65m in NFGC-23-1108, and 2.07 g/t Au over 17.60m in NFGC-22-935 (reported on April 18, 2023) and 17.2 g/t Au over 22.90m and 12.0 g/t Au over 18.40m in NFGC-22-1040 and 1.53 g/t Au over 34.75m in NFGC-23-1155 (reported on April 25, 2023) provide further confidence in the robustness and consistency of gold mineralization in this system. Step-out and infill drilling are ongoing at Keats West to expand on this new discovery and to better define the continuity of grade and the controls on the gold mineralization within the host fault.

 

- 30 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

2022 and 2023 assay results have been reported in press release dated May 4, 2022, September 27, 2022, November 23, 2022, November 28, 2022, January 24, 2023, March 21, 2023, April 18, 2023, and April 25, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from Keats West drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t)
NFGC-22-533 98.25 105.00 6.75 8.70
Including 100.65 101.50 0.85 53.3
And 127.40 129.55 2.15 1.60
NFGC-22-643A 8.20 14.30 6.10 1.88
And 22.50 25.70 3.20 2.64
And 39.00 46.00 7.00 1.48
And 49.00 54.20 5.20 1.85
And 56.35 65.00 8.65 1.57
NFGC-22-660 9.00 12.00 3.00 1.97
And 22.20 26.30 4.10 2.22
And 36.45 40.90 4.45 1.27
And 43.90 46.05 2.15 1.67
And 52.25 68.10 15.85 2.01
Including 67.45 68.10 0.65 11.30
NFGC-22-667A 6.35 15.20 8.85 3.47
And 18.40 26.00 7.60 2.48
And 38.00 44.00 6.00 1.84
And 48.75 57.30 8.55 1.34
NFGC-22-681 116.80 121.00 4.20 17.87
Including 116.80 117.25 0.45 15.90
And including 120.30 121.00 0.70 68.80
NFGC-22-686 100.50 111.00 10.50 10.36
Including 101.30 102.55 1.25 43.84
And including 103.05 103.45 0.40 88.20
NFGC-22-759 66.80 80.05 13.25 1.82
NFGC-22-773 11.85 16.20 4.35 2.63
And1 18.60 34.55 15.95 18.62
And Including 24.85 25.85 1.00 252.99
NFGC-22-784 13.40 37.40 24.00 6.68
Including 18.95 20.45 1.50 37.43
Including 20.85 21.55 0.70 14.90
Including 26.00 27.50 1.50 24.70
Including 36.45 37.40 0.95 12.75
NFGC-22-808 44.00 49.00 5.00 13.90
Including 44.00 45.80 1.80 23.40
Including 46.95 47.35 0.40 20.10
Including 47.70 48.35 0.65 12.05
And1 55.00 62.00 7.00 2.01
NFGC-22-8332 11.00 22.40 11.40 3.25
And2 30.00 65.00 35.00 2.41
And2 74.00 91.35 17.35 1.61
Aggregate4 11.00 91.35 79.75 1.94
NFGC-22-8432 31.40 38.30 6.90 7.71
Including2 31.80 32.40 0.60 77.10
NFGC-22-8652 101.10 104.65 3.55 61.76

 

- 31 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Including2 102.70 103.40 0.70 301.09
NFGC-22-868 78.20 94.45 16.25 2.12
NFGC-22-8752 59.00 74.00 15.00 2.09
NFGC-22-9112 56.00 87.55 31.55 4.27
Including 60.70 62.10 1.40 14.66
Including 86.00 87.55 1.55 31.06
NFGC-22-9222 52.00 54.00 2.00 8.13
Including2 53.00 54.00 1.00 14.30
And2 63.40 80.00 16.60 3.26
Including2 73.30 74.25 0.95 25.23
And2 128.70 150.00 21.30 4.32
Including2 133.45 134.20 0.75 14.40
Including2 139.55 140.50 0.95 10.25
Including2 143.55 144.25 0.70 23.90
NFGC-22-9352 105.90 123.50 17.60 2.07
Including 114.45 114.85 0.40 10.60
NFGC-22-9452 78.10 100.60 22.50 10.05
Including2 88.15 88.80 0.65 12.55
Including2 90.00 91.00 1.00 12.95
Including2 93.70 94.85 1.15 14.24
Including2 95.65 96.00 0.35 16.10
Including2 99.95 100.60 0.65 221.00
NFGC-22-960 25.35 35.25 9.90 2.08
And 39.60 44.20 4.60 1.18
And 49.90 55.15 5.25 2.14
And 145.00 177.00 32.00 42.64
Including 151.35 152.30 0.95 14.05
And Including 156.65 157.55 0.90 86.60
And Including 159.40 161.30 1.90 24.06
And Including 162.05 162.95 0.90 29.68
And Including 163.75 164.35 0.60 24.50
And Including 165.70 167.00 1.30 16.26
And Including3 170.50 177.00 6.50 171.55
And Including 170.50 173.10 2.60 121.57
And Including 173.70 177.00 3.30 241.54
NFGC-22-9892 9.70 39.10 29.40 2.53
Including 30.00 30.35 0.35 46.90
Including 38.75 39.10 0.35 84.00
NFGC-22-9922 17.50 24.15 6.65 2.85
And2 27.00 29.00 2.00 1.44
And2 32.00 39.20 7.20 1.98
NFGC-22-9962 39.40 64.00 24.60 1.28
NFGC-22-1040 40.40 63.30 22.90 17.23
Including 45.85 47.45 1.60 162.12
Including 49.45 49.95 0.50 18.82
Including 58.50 59.00 0.50 161.66
Including 61.95 62.65 0.70 14.18
And 69.65 88.05 18.40 12.00
Including 71.25 72.10 0.85 12.00
Including 72.55 73.30 0.75 57.67
Including 80.10 80.50 0.40 93.75
Including 82.50 82.85 0.35 53.36

 

- 32 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Including 85.75 87.30 1.55 47.87
NFGC-22-1049A2 66.40 77.35 10.95 1.40
And2 95.00 107.20 12.20 1.10
NFGC-23-11082 94.00 98.65 4.65 8.42
Including 95.00 96.45 1.45 12.47
Including 98.00 98.65 0.65 12.60
NFGC-23-11552 55.55 90.30 34.75 1.53

 

1Note that the host structures are interpreted to be shallowly dipping and true widths are generally estimated to be 60-95% of reported intervals. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.2 Interval includes a maximum of 4m consecutive dilution. 3 Exception to including clause defined above, contains 3.25 g/t Au over 0.60m. 4Aggregate composite of the entire mineralized envelope.

 

Hole No. Azimuth Dip Length (m) UTM E UTM N
NFGC-22-533 -45 120 320 657952 5427747
NFGC-22-643A -53 51 302 658101 5427994
NFGC-22-660 -45 57 281 658101 5427993
NFGC-22-667A -53 45 293 658101 5427994
NFGC-22-681 -63 120 131 658053 5427905
NFGC-22-686 -60 70 206 658053 5427905
NFGC-22-759 -45 76 146 658092 5427940
NFGC-22-773 -45 62 218 658098 5428052
NFGC-22-784 -46 75 230 658098 5428052
NFGC-22-808 -45 120 149 658058 5428076
NFGC-22-833 120 -45.5 221 658033 5428032
NFGC-22-843 65 -52 200 658032 5428032
NFGC-22-865 127 -66 185 658046 5427939
NFGC-22-868 -46 67 326 658048 5427939
NFGC-22-875 39 -52 335 658092 5427942
NFGC-22-911 120 -45 352 657991 5428056
NFGC-22-922 37 -56 258 658003 5427818
NFGC-22-935 120 -45 302 657962 5428016
NFGC-22-945 58 -47 237 657949 5427794
NFGC-22-960 -45 120 378 657980 5427948
NFGC-22-989 35 -45 84 658126 5428023
NFGC-22-992 -45 35 117 658138 5428009
NFGC-22-996 35 -45 93 658124 5427976
NFGC-22-1040 56 -53 206 657952 5427847
NFGC-22-1049A 114 -45 315 657909 5427989
NFGC-23-1108 55 -47 233 657906 5427818
NFGC-23-1155 203 -61 179 658124 5427975

 

- 33 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest drilling results for Keast West are shown in the 3-D images below:

 

 

Queensway Project – Keats West inclined 3-D view with main veins plotted only, looking south (March 21, 2023)

 

 

Queensway Project – Keats West 3-D view, looking east (April 25, 2023)

 

- 34 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Lotto Zone Drilling

 

The Company has reported several significant gold assay intervals from the Lotto Zone starting with its first drill hole NFGC-20-17 reporting 16.3 g/t Au over 2.20m, 41.2 g/t Au over 4.75m and a third interval of 25.4 g/t Au over 5.15m (reported on October 2, 2020). Following this result, the Lotto Main vein has been systematically tested and expanded by subsequent highlight intercepts of 225 g/t Au over 2.45m in NFGC-21-100 (reported on February 23, 2021), 51.3 g/t Au over 3.20m in NFGC-21-109 (reported on March 23, 2021), 53.3 g/t Au over 3.10m in NFGC-21-115 (reported on March 23, 2021) and 150 g/t over 11.50m in NFGC-21-201 (reported on June 23, 2021).

 

Continued exploration drilling working to expand the Lotto Main Vein increased the domain of contained high-grade gold mineralization to 225m vertical depth with NFGC-21-367A reporting 24.3 g/t Au over 2.20m (reported on March 24, 2022) and extended the strike length to over 220m with the intercept of 16.1 g/t Au over 3.60m in NFGC-22-664 (September 13, 2022). This vein has been intersected at depths of up to 350m vertical. Infill drilling targeting a “roll”, an area where there is a drastic change in orientation of the Lotto Main Vein intersected 152 g/t Au over 3.85m in NFGC-22-673 and 13.0 g/t Au over 14.95m in NFGC-22-684 (reported on September 13, 2022).

 

The Lotto Zone is comprised of a north-south striking, steeply east-dipping vein ("Lotto Main Vein") located approximately 200m east of the AFZ and drilling to date on the Lotto Main Vein has confirmed good continuity of a high-grade lens that is interpreted to plunge steeply to the northeast in addition to defining new corridors of high-grade gold contained within the vein.

 

On January 14, 2021, the Company announced the discovery of a new zone named the “Sunday Zone” proximal to the Lotto Zone within the footwall of the AFZ. This new discovery represents the first known occurrence of gold mineralization proximal to the primary Appleton Fault Zone with an intercept in drill hole NFGC-20-44 grading 18.1g/t Au over 6.5m at a down hole depth of 239m (reported on January 14, 2021).

 

Follow-up drilling targeting the Sunday Zone and the footwall to the AFZ intercepted 23.1 g/t Au over 2.05m in NFGC-21-319 (reported on March 24, 2022) located ~65m down-dip of NFGC-20-44 and identified a second zone to the south named the “Tuesday Zone” that reported 89.5 g/t Au over 2.00m in NFGC-22-552 (reported on June 8, 2022).

 

2022 and 2023 assay results have been reported in press release dated March 24, 2022, June 8, 2022, September 13, 2022, November 2, 2022, and January 10, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from Lotto drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t) Zone
NFGC-21-243 243.75 245.75 2.00 10.74 Lotto Main
Including 244.50 245.45 0.95 22.49
NFGC-21-289 192.95 195.35 2.40 12.57 Lotto Main
Including 193.25 194.55 1.30 21.58
NFGC-21-295 110.20 112.20 2.00 12.19 Lotto Main
Including 110.55 111.25 0.70 34.81
NFGC-21-296 228.00 230.60 2.60 15.66 Lotto Main
NFGC-21-319 176.60 179.00 2.40 20.01 Lotto Main
Including 176.60 177.70 1.10 43.32
And 315.30 317.35 2.05 23.08 Sunday
NFGC-21-333 61.40 64.00 2.60 11.67 Lotto Main
Including 62.75 63.25 0.50 58.00
NFGC-21-338 282.65 284.80 2.15 25.31 Lotto Main
Including 284.05 284.50 0.45 115.25 Lotto Main

 

- 35 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

NFGC-21-367A 324.45 326.65 2.20 24.25 Lotto Main
NFGC-21-404A 217.15 219.20 2.05 31.63 Lotto Main
Including 217.45 218.05 0.60 107.50 Lotto Main
NFGC-22-552 87.95 89.95 2.00 89.5 Tuesday
Including 88.35 88.75 0.40 442
NFGC-22-664 66.40 70.00 3.60 16.13 Lotto Main
Including 68.80 69.35 0.55 92.60
NFGC-22-673 206.15 210.00 3.85 152.08 Lotto Main
Including 206.15 208.90 2.75 211.91
NFGC-22-684 211.45 226.40 14.95 12.98 Lotto Main
Including 216.30 217.00 0.70 25.30
And including 224.30 226.40 2.10 72.35
NFGC-22-753 204.35 207.65 3.30 11.38 Lotto Main
Including 204.35 205.15 0.80 45.40

 

1Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 40% to 90% of reported intervals. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N
NFGC-21-243 298 -50 323 659064 5428888
NFGC-21-289 299 -45 345 659030 5428958
NFGC-21-295 300 -45 128 659052 5429149
NFGC-21-296 299 -45.5 255 659058 5428943
NFGC-21-319 299 -45.5 342 659010 5428998
NFGC-21-333 299 -45.5 336 658985 5429013
NFGC-21-338 298 -45.5 312 659099 5428890
NFGC-21-367A 298 -47 369 659125 5428876
NFGC-21-404A 299 -48 374 659046 5429007
NFGC-22-552 300 -45 201 658833 5429014
NFGC-22-664 300 -61 174 658919 5429139
NFGC-22-673 263 -68 258 658990 5429097
NFGC-22-684 258 -69 237 658983 5429072
NFGC-22-753 263 -55 396 659046 5429140

 

- 36 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest results from the Lotto and Lotto North zones are shown in the long section and plan map and Lotto only in cross section below:

 

 

 

Queensway Project – Dome- Lotto North plan view map (November 2, 2022)

 

- 37 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Lotto- Lotto North zones long section, looking northwest (May 10, 2023)

 

- 38 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Lotto cross-section, +/- 12.5m, looking northeast (September 13, 2022)

 

Lotto North

 

The Lotto North prospect is adjacent (north) to the Lotto prospect in QWN on the east side of the AFZ. Systematic grid drilling testing along the eastern side of the AFZ north of Lotto identified this new gold-bearing structural zone in November 2022 first reporting 33.8 g/t Au over 2.35m in NFGC-22-661, 37.4 g/t Au over 2.10m in NFGC-22-690 and 22.2 g/t Au over 2.20m in NFGC-22-717.

 

With continued exploration drilling at Lotto North, gold mineralization was found to be hosted by a series of AFZ-typical epizonal-style veins contained within a north-south striking brittle fault zone immediately north of the Lotto prospect. Additional highlight intervals reported on January 10, 2023 including 16.1 g/t Au over 5.30m in NFGC-22-788, 14.6 g/t Au over 2.95m in NFGC-22-758, 11.1 g/t Au over 2.30m in NFGC-22-818, 4.72 g/t Au over 8.50m in NFGC-22-646 and 7.20 g/t Au over 4.55m in NFGC-22-895 expanded the Lotto North gold mineralization and host structure over a strike length of 340m. On May 10, 2023, results released extended mineralization to 200m vertical depth and brought the mineralization to near-surface with 11.1 g/t Au over 3.55m in NFGC-22-940 and 21.1 g/t Au over 2.15m in NFGC-22-953. The Lotto North structure remains open in all directions and is likely the same structure that hosts the Lotto Main vein but has been offset by late faulting in this region.

 

When combined with the Lotto Main Zone, these high-grade gold-bearing structures have been drill-defined over a total strike length of 630m. Exploration is ongoing to expand on this new discovery and is currently focussed from surface to 200m vertical depth.

 

- 39 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

2022 and 2023 assay results have been reported in press releases dated November 2, 2022 and January 10, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from Lotto North drilling are shown in the tables below:

 

 

Hole No. From (m) To (m) Interval (m) Au (g/t) Zone
NFGC-22-6462 71.80 80.30 8.50 4.72 Lotto N
Including 71.80 72.55 0.75 38.50
NFGC-22-6612 74.65 77.00 2.35 33.79 Lotto N
Including 74.95 75.30 0.35 225.00
NFGC-22-6901 69.45 71.55 2.10 37.36 Lotto N
Including 70.15 70.85 0.70 109.00
NFGC-22-7172 49.80 52.00 2.20 22.18 Lotto N
Including 49.80 50.80 1.00 48.74
NFGC-22-7583 155.65 158.60 2.95 14.58 Lotto N
Including 157.85 158.60 0.75 53.70
NFGC-22-7882 120.70 126.00 5.30 16.12 Lotto N
Including 122.00 123.55 1.55 49.63  
NFGC-22-8182 50.45 52.75 2.30 11.05 Lotto N
Including 52.40 52.75 0.35 72.10
NFGC-22-8951 174.65 179.20 4.55 7.20 Lotto N
Including 178.60 179.20 0.60 32.56
NFGC-22-9401 80.25 83.80 3.55 11.13 Lotto N
Including 82.15 82.80 0.65 51.70
NFGC-22-9531 77.85 80.00 2.15 21.11 Lotto N
Including 78.25 78.75 0.50 86.70

 

Note host structures are interpreted to be steeply dipping and true widths are generally estimated to be 170% to 95%, 240% to 70%, and 310% to 40% of reported intervals. 4True widths are unknown at this time. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 4m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No. Azi (°) Dip (°) Length (m) UTM E UTM N Prospect
NFGC-22-646 300 -45 429 659079 5429391 Lotto N
NFGC-22-661 285 -45 396 659079 5429391 Lotto N
NFGC-22-690 270 -42 264 659083 5429446 Lotto N
NFGC-22-717 300 -45 213 659089 5429559 Lotto N
NFGC-22-758 270 -45 234 659123 5429422 Lotto N
NFGC-22-788 240 -45 261 659068 5429628 Lotto N
NFGC-22-818 300 -45 219 658982 5429272 Lotto N
NFGC-22-895 70 -45 243 658848 5429213 Lotto N

NFGC-22-940 90 -45 135 658986 5429330 Lotto N
NFGC-22-953 90 -45 213 658943 5429355 Lotto N

 

- 40 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Zone 36/K2, Max Millions and Everest

 

On January 10, 2023, the Company reported the intersection of broad gold mineralization west of the AFZ and in close proximity to the Zone 36 prospect during systematic drilling stepping north of Lotto North, this interval graded 3.63 g/t Au over 9.50m in NFGC-22-816. Meanwhile, in light of the recent discovery at Keats West, the first major discovery made west of the AFZ, exploration drilling had shifted to targeting two structures identified in a lineament study that had orientations similar to the Keats Baseline Fault Zone. This work lead to the discoveries of K2 and Monte Carlo announced on May 10, 2023.

 

At K2, initial highlight intervals of 28.6 g/t Au over 2.00m in NFGC-22-902, 11.2 g/t Au over 4.25m in NFGC-22-959, 8.91 g/t Au over 4.70m in NFGC-22-827, 3.00 g/t Au over 11.00m in NFGC-22-898, 1.88 g/t Au over 14.75m in NFGC-22-892 and 1.44 g/t Au over 18.80m in NFGC-22-986 are controlled by the K2 fault, located 725m north of Lotto on the west side of the AFZ adjacent to Zone 36. K2 represents a significant structural zone with similarities to the Keats Baseline Fault Zone (“KBFZ”) including a similar orientation and consisting of a complex network of stockwork-style gold-bearing quartz veins that occur within a broad domain of brittle faulting. The K2 structure is interpreted as the master structure whereas Zone 36 is a related vein occurring in close proximity that was originally exposed in trenching.

 

Although at an early stage of interpretation and with several assays pending, mineralization associated with the K2 structure has already been traced over a strike length of 395m and to a maximum vertical depth of 250m. It remains open in all directions.

 

At Monte Carlo, the intervals of 12.3 g/t Au over 8.05m in NFGC-23-1151 and 13.0 g/t Au over 4.75m in NFGC-23-1145 are hosted by an east-west striking brittle fault zone that is associated with continuous quartz veining and gold mineralization over a current strike length of 150m. The Company’s current interpretation connects this gold-bearing structure over a strike length of 450m; additional infill drilling is required to confirm this model.

 

Monte Carlo occurs adjacent to Lotto but on the west side of the AFZ and has features similar to both Lotto and Golden Joint. Exploration has been largely focussed in the top 100m, several assays are pending, and mineralization is open in all directions.

 

The Company’s ongoing systematic grid drilling program working on the east side of the AFZ also tagged into a new zone of veining grading 36.7 g/t Au over 3.70m in NFGC-22-888 and 28.7 g/t Au over 2.30m in NFGC-22-930. This zone is named “Everest” and is located 1.5km northeast of Lotto. Mineralization is spatially associated with a shear zone and is within close proximity to the AFZ.

 

- 41 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

2023 assay results have been reported in press release dated January 10, 2023, and May 10, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from Monte Carlo, K2/ Zone 36 and Everest drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m) Au (g/t) Zone
NFGC-23-11451 61.80 66.55 4.75 13.04 Monte Carlo
Including 61.80 62.35 0.55 79.90
Including 64.15 64.55 0.40 20.10
NFGC-23-11511 63.25 71.30 8.05 12.28 Monte Carlo
Including 65.00 65.60 0.60 51.30
Including 67.70 68.10 0.40 111.00
           
NFGC-22-816 271.70 281.20 9.50 3.63 K2
Including 277.30 277.80 0.50 17.15
NFGC-22-8272 269.00 273.70 4.70 8.91 K2
Including 269.00 271.30 2.30 13.80
NFGC-22-8921 135.25 150.00 14.75 1.88 K2
NFGC-22-8982 176.00 187.00 11.00 3.00 K2
Including 182.20 183.00 0.80 14.80
NFGC-22-9024 59.00 61.00 2.00 28.58 K2
Including 59.00 60.00 1.00 48.80
NFGC-22-9381 45.20 57.10 11.90 1.94 K2
And 93.30 100.60 7.30 2.01
And 107.60 118.50 10.90 1.23
NFGC-22-9593 131.00 135.25 4.25 11.23 K2
Including 131.00 132.50 1.50 12.93
Including 133.20 134.80 1.60 13.45
And4 206.95 215.00 8.05 1.09
NFGC-22-9863 43.70 62.50 18.80 1.44 K2
And1 90.85 100.40 9.55 1.72
           
NFGC-22-8882 166.05 169.75 3.70 36.65 Everest
Including 166.05 166.65 0.60 13.00
Including 169.00 169.75 0.75 166.50
NFGC-22-9302 104.80 107.10 2.30 28.68 Everest
Including 105.40 105.90 0.50 131.50

 

Note host structures are interpreted to be moderately dipping and true widths are generally estimated to be 170% to 95%, 240% to 70%, and 310% to 40% of reported intervals. 4True widths are unknown at this time. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 4m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N Prospect
NFGC-22-816 300 -45 291 659185 5429676 K2
NFGC-22-827 300 -45 390 659188 5429731 Everest
NFGC-22-888 300 -45 272 659547 5430506 Everest
NFGC-22-892 300 -45 242 658967 5429766 K2
NFGC-22-898 260 -44 230 658965 5429766 K2
NFGC-22-902 120 -45 218 658970 5429767 K2
NFGC-22-930 300 -45 299 659506 5430530 Everest
NFGC-22-938 359 -47 158 659051 5429922 K2
NFGC-22-940 90 -45 135 658986 5429330 Everest
NFGC-22-943 300 -47 221 658359 5429317 Monte Carlo
NFGC-22-959 35 -66 293 658934 5429699 K2
NFGC-23-1145 5 -42 173 658659 5429192 Monte Carlo
NFGC-23-1147 270 -53 189 659036 5429590 Everest
NFGC-23-1151 300 -45 164 658657 5429196 Monte Carlo

 

- 42 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest results from the K2/Zone 36, Monte Carlo, and Everest zones are shown in the long sections and plan map below:

 

 

 

Queensway Project – Dome- Everest plan view map (May 10, 2023)

- 43 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – K2/Zone 36 long section, looking northwest (May 10, 2023)

- 44 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Monte Carlo long section, looking northwest (May 10, 2023)

- 45 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Golden Joint Drilling

 

On June 30, 2021, the Company announced the discovery of a new high-grade zone in the footwall of the AFZ named the Golden Joint with initial highlight intervals of 10.4 g/t Au over 4.85m in NFGC-21-171 and 430 g/t Au over 5.25m in NFGC-21-241. The Golden Joint prospect is comprised of two sub-parallel vein systems (Main Zone and HW Zone) and located between the Keats and Lotto zones. Golden Joint Main Zone, consists of an approximately north-south striking, steeply west-dipping quartz vein and associated brittle fault in the footwall to the AFZ whereas the HW Zone forms a network of stock-work style veining that is largely constrained to a thick bed of greywacke and is more distal to the AFZ.

 

Further assay results were published on September 28, 2021, with a notable intersection in NFGC-21-386 yielding 70.7 g/t Au over 5.25m. On January 19, 2022, the results reported showed the expansion of the Golden Joint Main Zone to a vertical depth of ~305m with drill hole NFGC-21-401 intersecting 98.1g/t Au over 3.85m and a vein-defined strike length of ~250m. Infill drilling results reported on March 24, 2022, identified a domain of significant high-grade in NFGC-21-462 which returned 69.2 g/t Au over 14.15m.

 

The Golden Joint HW continues to expand in all directions. Drilling to date has extended the zone over a strike length of 190m and to a vertical depth of 150m. Highlight intervals include 64.9 g/t Au over 2.10m and 17.4 g/t Au over 2.45m in NFGC-21-225 reported on September 30, 2021, 33.1 g/t Au over 2.10m in NFGC-21-274 reported on January 6, 2022, 4.96 g/t Au over 6.20m in NFGC-21-187 reported on January 6, 2022 and the latest reported result on March 24, 2022 of 13.4 g/t Au over 2.10m in NFGC-21-264.

 

2022 assay results have been reported in press release dated January 6, 2022, January 19, 2022, and March 24, 2022, found through SEDAR.

 

Highlighted assay values and drill hole locations from Golden Joint drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t) Zone
NFGC-21-386 424.75 430.00 5.25 70.65 Main
NFGC-21-401 450.15 454.00 3.85 98.13 Main
NFGC-21-462 325.75 339.90 14.15 69.15 Main
Including 325.75 330.70 4.95 40.36 Main
Including 326.30 327.25 0.95 182.50
And including 333.30 339.90 6.60 117.85
Including 333.30 334.25 0.95 96.10
Including 335.85 337.15 1.30 190.63
Including 338.00 339.90 1.90 228.03
NFGC-21-264 102.00 104.10 2.10 13.35 HW
NFGC-21-274 164.65 166.75 2.10 33.10 HW

 

1Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 40% to 70% of reported intervals. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N
NFGC-21-264 297 -45 438 658595 5428386
NFGC-21-274 294 -49 552 658616 5428373
NFGC-21-386 298.5 -46.5 582 658634 5428306
NFGC-21-401 298.5 -46.5 492 658613 5428319
NFGC-21-462 298 -47.5 486 658590 5428331

 

- 46 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest results from the Golden Joint prospect are shown in the long section, plan map and cross-section below:

 

 

 

Queensway Project – Golden Joint – Lotto North plan map (February 16, 2023)

 

- 47 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

Queensway Project – Golden Joint – Lotto North long section (February 16, 2023)

 

- 48 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

Queensway Project – Golden Joint cross-section, +/- 12.5m, looking northeast (February 16, 2023)

 

TCH and Knob (Rocket Vein)

 

The Trans-Canada Highway (TCH) prospect is located between Cokes and Knob.

 

On January 18, 2023, the Company announced results from its drilling at the TCH prospect where systematic reconnaissance grid drilling south of the Trans-Canada highway along the eastern side of the AFZ identified a new gold-bearing zone called “TCH (Trans Canada Highway)” with intercepts of 79.6 g/t Au over 2.00m in NFGC-22-863, 10.5 g/t Au over 2.45m in NFGC-22-642 and 1.02 g/t Au over 10.70m in NFGC-22-703. This structure is located in the footwall to the AFZ and has been intersected over a strike length of 190m and down to a vertical depth of 300m.

 

At the TCH prospect, mineralization has been identified in structures located in both the hangingwall (TCW) and footwall (TCH) of the AFZ. Epizonal-style veining is associated with significant brittle faulting and silicification in the siltstones. Work is ongoing at TCW targeting Keats-Baseline oriented structures that may exist in the stratigraphy west of the AFZ.

 

- 49 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Also announced on January 18, 2023, were results from targeted drilling at the Knob prospect which identified a new vein now called “Rocket” located 100m to the northeast. The highlight interval of 12.6 g/t Au over 4.45m in NFGC-22-704 was intersected at a vertical depth of 65m. The Knob zone is a historical discovery with mineralization hosted within an east-west striking structure largely constrained to greywacke which has been traced over a strike length of 160m and has seen minimal modern-day drilling. Limited drilling has been completed in the Knob prospect area due to access issues and other drilling priorities. No immediate follow-up work is scheduled at this time and is pending suitable access.

 

2022 and 2023 assay results have been reported in press releases February 24, 2022 and January 18, 2023, found through SEDAR.

 

Highlighted assay values and drill hole locations from TCH and Rocket (Knob) drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t) Zone
NFGC-22-642 303.45 305.90 2.45 10.45 TCH
Including 303.80 304.35 0.55 14.46
Including 305.40 305.90 0.50 32.43
NFGC-22-703 183.00 193.70 10.70 1.02 TCH
NFGC-22-863 427.10 429.10 2.00 79.62 TCH
Including 427.10 427.80 0.70 226.46
NFGC-22-7042 86.60 91.05 4.45 12.63

Knob

(Rocket Vein)

Including2 88.00 88.45 0.45 118.50

 

1Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 25% to 95% of the reported interval.2True width ranges are generally estimated to be 60% to 90%. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2m with a maximum of 2m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness.

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N Prospect
NFGC-22-642 300 -45 500 657636 5426511 TCH
NFGC-22-703 300 -45 284 657594 5426495 TCH
NFGC-22-704 100 -50 107 657192 5425868 Rocket
NFGC-22-863 300 -45 472 657573 5426335 TCH

 

- 50 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest results from the TCH and Knob (Rocket Vein) are shown the plan map below:

 

 

 

Queensway Project – Knob – Keats Main South plan map (February 16, 2023)

 

- 51 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

JBP Drilling

 

On March 9, 2022, the Company announced results from reconnaissance diamond drilling designed to test for epizonal style high-grade gold mineralization along the JBPFZ. This initial phase of drilling focused on a +3.5km segment of the JBPFZ encompassing 1744 and Pocket Pond target areas following up on historic drill results, high-grade float samples and Au-in-till anomalies as well as testing new conceptual targets. This program to date has produced a number of salient results including 31.9 g/t Au over 2.05m in NFGC-21-180 at 1744 and 25.4 g/t Au over 2.25m in NFGC-21-304 at Pocket Pond.

 

Further work is needed to define mineralization at 1744, but preliminary interpretation suggest that gold may be hosted in two subparallel zones that dip steeply toward the northwest; these zones consist of discrete domains of brittle deformation associated with folding within a green siltstone unit. Gold is hosted in irregular massive to vuggy stylolitic veins with trace pyrite, chalcopyrite, arsenopyrite and boulangerite and has the same NH4 muscovite alteration signature seen elsewhere along the AFZ.

 

At Pocket Pond, drilling has identified mineralization like that seen in the 1744 area, characteristic of the JBP structural trend of epizonal-style, with irregular stylolitic massive to vuggy veins that are spatially associated with brittle faulting and folding in a green siltstone unit Continuity of grade has been difficult to establish; preliminary interpretation suggests that some of the Pocket Pond veins may dip steeply to the northwest. Continued exploration drilling is planned for the JBPFZ to expand on these discoveries in addition to test several unexplored targets along this trend.

 

2022 assay results have been reported in press release on March 9, 2022, found through SEDAR.

 

Highlighted assay values and drill hole locations from the JBP drilling are shown in the tables below:

 

Hole No. From (m) To (m) Interval (m)1 Au (g/t) Zone
NFGC-21-1801 32.00 34.05 2.05 31.88 1744
NFGC-21-1951 283.70 286.50 2.80 16.66 1744
NFGC-21-2021 145.85 147.90 2.05 17.10 1744
NFGC-21-2072 60.00 66.00 6.00 8.66 1744
Including 63.55 66.00 2.45 19.66
NFGC-21-2302 87.00 89.00 2.00 8.92 Pocket Pond
NFGC-21-2452 152.60 154.80 2.20 7.26 Pocket Pond
NFGC-21-3042 81.60 83.85 2.25 25.40 Pocket Pond
And 90.50 96.35 5.85 5.46
Including 90.50 93.85 3.35 8.94

 

1Note that the host structures are interpreted to be steeply dipping and true widths are generally estimated to be 20% to 70% of reported intervals.2 True widths are unknown at this time. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Intervals are calculated at a 1 g/t Au cut-off grade; grades have not been capped in the averaging.

 

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N Prospect
NFGC-21-180 300 -45 245 665204 5430850 1744
NFGC-21-195 300 -45 304 665267 5430870 1744
NFGC-21-202 300 -45 245 665190 5430887 1744
NFGC-21-207 299 -45.5 341 665232 5430862 1744
NFGC-21-230 119 -45.5 182 663403 5428873 Pocket Pond
NFGC-21-245 120 -45 251 663365 5428880 Pocket Pond
NFGC-21-304 121 -45.5 182 663432 5428898 Pocket Pond

 

- 52 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The latest results from the JBPFZ covering both 1744 and Pocket Pond target areas are shown in the long sections and plan maps below:

 

 

 

Queensway Project – 1744 long section, looking northwest (February 16, 2023)

 

- 53 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – 1744 plan map (February 16, 2023)

 

- 54 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Pocket Pond long section, looking northwest (February 16, 2023)

 

- 55 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway Project – Pocket Pond plan map (February 16, 2023)

 

2020-2022 Field Program

 

Starting in June 2020, the Company initiated a field reconnaissance program within the QWS mineral licenses. The objective of this program is to conduct geological mapping, structural analysis, prospecting and the collection of C horizon till samples to be processed for gold grain analysis.

 

Initial results from the 2020 field program detailed till survey were reported on August 27, 2020, where the Company had announced it had found a new fertile gold region 45km south of the current Queensway North drill targets. The Eastern Pond target is comprised of two areas where recent till results have shown highly anomalous total gold grain counts including a high percentage of pristine gold grains and yielded several sub-crop samples up to 15.0 g/t Au.

 

- 56 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

One till sample yielded 216 gold grains, 163 (75%) of them classified as pristine. A second cluster of samples yielded up to 155 gold grains with 127 (82%) of these classified as pristine. The pristine morphology of these grains indicates that they have not travelled far from their bedrock source.

 

To date the Eastern Pond target is defined by sub-crop and till sample results over an approximately 4km of strike length (see Figures below). Five other gold in till anomalies have been discovered to date within QWS and warrant follow up exploration.

 

 

 

Queensway Project: Gold occurrences in rocks and tills and major prospects

 

- 57 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

 

 

Queensway South Project: Eastern Pond anomaly and preliminary till results

 

 

 

Queensway South Project: Eastern Pond target till samples

 

Field crews were remobilized to the Eastern Pond area in late 2020 to conduct follow up work including prospecting, geological mapping and the collection of additional till samples to further vector the Company’s exploration towards bedrock sources. Follow up work at Eastern Pond in late 2020 resulted in the collection of rock samples, additional tills samples and two trenches were excavated.

 

In June 2021 field crews were mobilized to conduct early-stage exploration work throughout the Queensway Project including till sampling, geological mapping, rock sampling and trenching. The goal of this program has been to aid in the development of drilling targets for a planned diamond drilling program in 2022.

 

- 58 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

In the spring of 2022, field crews were mobilized to continue with the early-stage exploration work with a program involving mapping and prospecting of new target areas and previously worked prospects to help advance these areas to the drill phase, reconnaissance-scale soil sampling and trenching. Approximately 9000 soil samples were collected in addition to 15 trenches completed. The complete results of this program are pending. Concurrently, the first drill was mobilized in August 2022 to drill-ready targets generated from previous field programs. This program consisted of 7,255m drilled in 33 holes over 7 target areas including Aztec, Bernards Pond, Devil’s Trench, Eastern Pond, Goose, Greenwood, and Paul’s Pond. Assays for this drilling program are pending.

 

 

 

Drillhole Collar Locations in QWS.

 

2023 regional exploration program plans will involve first-pass soil sampling, mapping, prospecting and drilling at the new VOA Option north of Queensway North. Expansion of existing soil grids, collection of new soil grids, mapping and prospecting of new areas in addition to targets generated from the previous field seasons, trenching, follow-up drilling and drill-testing of new target areas is also planned at QWS.

 

Sampling, Sub-sampling and Laboratory

 

All drilling recovers HQ core. Drill core is split in half using a diamond saw or a hydraulic splitter for rare intersections with incompetent core.

 

A geologist examines the drill core and marks out the intervals to be sampled and the cutting line. Sample lengths are mostly 1.0 meter and adjusted to respect lithological and/or mineralogical contacts and isolate narrow (<1.0m) veins or other structures that may yield higher grades.

 

- 59 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Technicians saw the core along the defined cutting line. One-half of the core is kept as a witness sample and the other half is submitted for analysis. Individual sample bags are sealed and placed into totes, sealed and marked with the contents.

 

NFG submits samples for gold determination by fire assay to ALS Canada Ltd. (“ALS”) and by photon assay to MSALABS (“MSA”) since June 2022. ALS and MSA operate under a commercial contract with New Found.

 

Drill core samples are shipped to ALS for sample preparation in Sudbury, Ontario, Thunder Bay, Ontario, or Moncton, New Brunswick. ALS is an ISO-17025 accredited laboratory for the fire assay method.

 

Drill core samples are also submitted to MSA in Val-d’Or, Quebec. MSA operates numerous laboratories worldwide and maintains ISO-17025 accreditation for many metal determination methods. Accreditation of the photon assay method at the MSA Val D’Or laboratory is in progress.

 

At ALS, the entire sample is crushed to approximately 70% passing 2mm. A 3,000-g split is pulverized. “Routine” samples do not have visible gold (VG) identified and are not within a mineralized zone. Routine samples are assayed for gold by 30-g fire assay with an inductively-couple plasma spectrometry (ICP) finish. If the initial 30-g fire assay gold result is over 1 g/t, the remainder of the 3,000-g split is screened at 106 microns for screened metallics assay. For the screened metallics assay, the entire coarse fraction (sized greater than 106 microns) is fire assayed and two splits of the fine fraction (sized less than 106 microns) are fire assayed. The three assays are combined on a weight-averaged basis. Samples that have VG identified or fall within a mineralized interval are automatically submitted for screened metallic assay for gold.

 

At MSA, the entire sample is crushed to approximately 70% passing 2mm. For “routine” samples that do not have VG identified and are not within a mineralized zone, the samples are riffle split to fill two 450g jars for photon assay. The assays reported from both jars are combined on a weight-averaged basis. If one of the jars assays greater than 1 g/t, the remaining crushed material is weighed into multiple jars and are submitted for photon assay.

 

For samples that have VG identified or are within a mineralized zone, the entire crushed sample is weighed into multiple jars and are submitted for photon assay. The assays from all jars are combined on a weight-averaged basis.

 

All samples prepared at ALS or MSA are also analyzed for a multi-element ICP package (ALS method code ME-ICP61) at ALS Vancouver.

 

Drill program design, Quality Assurance/Quality Control and interpretation of results are performed by qualified persons employing a rigorous Quality Assurance/Quality Control program consistent with industry best practices. Standards and blanks account for a minimum of 10% of the samples in addition to the laboratory’s internal quality assurance programs.

 

Quality Control data are evaluated on receipt from the laboratories for failures. Appropriate action is taken if assay results for standards and blanks fall outside allowed tolerances. All results stated have passed New Found’s quality control protocols.

 

New Found’s quality control program also includes submission of the second half of the core for approximately 5% of the drilled intervals. In addition, approximately 1% of sample pulps for mineralized samples are submitted for re-analysis to a second ISO-accredited laboratory for check assays.

 

- 60 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The Company does not recognize any factors of drilling, sampling or recovery that could materially affect the accuracy or reliability of the assay data disclosed.

 

The assay data disclosed in this news release have been verified by the Company’s Qualified Person against the original assay certificates.

 

The Company notes that it has not completed any economic evaluations of its Queensway Project and that the Queensway Project does not have any resources or reserves.

 

Qualified Person

 

The technical content disclosed in this MD&A was reviewed and approved by Greg Matheson, P. Geo., Chief Operating Officer, and a Qualified Person as defined under National Instrument 43-101. Mr. Matheson consents to the publication of this MD&A, by NFG.

 

Report of QA/QC Program Review

 

On February 23, 2022, the Company announced the results of work programs and analysis completed by independent consultants initiated to investigate possible bias indicated by a set of 30 half-core duplicate assays (see Company's November 4, 2021, news release). The work program included completion of a substantial number of additional half-core screen fire assays providing a data set of 475 half-core duplicates, and the detailed statistical assessment of these results. The work also included detailed review of sample selection, preparation, and lab analysis procedures for the screen fire assays at ALS Minerals (‘ALS’) in Vancouver, BC and Eastern Analytical (‘EA’) in Springdale, NL. New Found's independent consultants concluded that there was no evidence of systematic bias in the Company's assay results and that the project uses well-conceived and documented standard operating procedures (SOPs) for marking and sawing core, and for selecting the half-core samples sent for analysis. Based on these conclusions the Company resumed normal reporting of assay results.

 

Lucky Strike Project, Ontario

 

The Lucky Strike Project is located 10km north of Larder Lake, Ontario and covers favourable and underexplored structural corridors associated with the Larder Cadillac Deformation Zone. The project is comprised of 644 single cell un-patented mining claims and covers an area of 11,684ha.

 

The current mineral cells comprising the Lucky Strike Project were acquired from the completion of two option agreements, one purchase agreement and online staking. The project was consolidated from May 2016 through May 2020 and currently the project is 100% owned by the company subject to various NSR up to 2%.

 

On February 16, 2023, the Company entered into an agreement with Warrior Gold Inc. (“Warrior Gold”), pursuant to which Warrior Gold will acquire the Lucky Strike project in exchange for total consideration of 28,612,500 Warrior Gold shares, issued on a post-consolidation basis at the time of closing, and a 1.0% net smelter return royalty to the Company. The completion of the agreement is subject to the approval of the TSX Venture Exchange, the completion of a concurrent private placement financing by Warrior Gold, and completion of other customary closing conditions as specified in the agreement.

 

On April 18, 2023, the agreement with Warrior Gold to acquire the Lucky Strike project received approval from the shareholders of Warrior Gold. On May 8, 2023, the Company and Warrior Gold entered into an amendment to the purchase agreement to provide that completion of the transaction is conditional on the completion of a concurrent private placement financing for minimum gross proceeds of $5,000,000 instead of $10,000,000.

 

The transaction, subject to completion of customary closing conditions as specified in the purchase agreement, is expected to close on or around May 26, 2023.

 

- 61 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The schedules below summarize the carrying costs of acquisition costs and exploration expenditures incurred to date for each exploration and evaluation asset that the Company is continuing to explore as at March 31, 2023 and December 31, 2022:

 

   Newfoundland     
Three months ended March 31, 2023  Queensway
$
   Other
$
   Ontario
$
   Total
$
 
Exploration and evaluation assets                    
Balance as at December 31, 2022   8,616,693    47,916    272,000    8,936,609 
Additions                    
Claim staking and license renewal costs   2,400    -    -    2,400 
Balance as at March 31, 2023   8,619,093    47,916    272,000    8,939,009 
                     
Exploration and evaluation expenditures                    
Cumulative exploration expense - December 31, 2022   121,302,318    539,998    3,428,034    125,270,350 
Assays   3,076,329    50    -    3,076,379 
Drilling   10,434,259    -    -    10,434,259 
Environmental studies   213,144    -    -    213,144 
Geochemistry   248,815    -    -    248,815 
Geophysics   209,436    -    -    209,436 
Imagery and mapping   40,033    -    -    40,033 
Metallurgy   15,756    -    -    15,756 
Office and general   238,206    -    144    238,350 
Permitting   13,493    -    -    13,493 
Property taxes, mining leases and rent   86,673    -    2,123    88,796 
Reclamation   252,027    -    -    252,027 
Salaries and consulting   2,706,338    9,714    8,000    2,724,052 
Seismic survey   2,580,660    -    -    2,580,660 
Supplies and equipment   1,185,869    -    480    1,186,349 
Technical reports   55,025    -    -    55,025 
Travel and accommodations   315,352    309    -    315,661 
Exploration cost recovery   (45,450)   -    -    (45,450)
    21,625,965    10,073    10,747    21,646,785 
Cumulative exploration expense – March 31, 2023   142,928,283    550,071    3,438,781    146,917,135 

 

- 62 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

   Newfoundland         
Three months ended March 31, 2022  Queensway
$
   Other
$
   Ontario
$
   Total
$
 
Exploration and evaluation assets                    
Balance as at December 31, 2021   8,236,181    17,700    271,600    8,525,481 
Additions                    
Claim staking and license renewal cost   2,399    -    -    2,399 
Balance at March 31, 2022   8,238,580    17,700    271,600    8,527,880 
                     
Exploration and evaluation expenditures                    
Cumulative exploration expense – December 31, 2021   51,439,957    59,646    2,350,201    53,849,804 
Assays   2,368,849    -    88,405    2,457,254 
Drilling   5,905,445    -    449,063    6,354,508 
Environmental studies   51,922    -    -    51,922 
Geophysics   430,966    -    89,850    520,816 
Imagery and mapping   18,764    -    -    18,764 
Office and general   170,939    -    3,118    174,057 
Property taxes, mining leases and rent   29,057    -    1,027    30,084 
Petrography   9,372    -    -    9,372 
Reclamation   123,000    -    -    123,000 
Salaries and consulting   1,944,396    -    73,093    2,017,489 
Supplies and equipment   1,137,149    -    29,989    1,167,138 
Technical reports   150,784    -    -    150,784 
Travel and accommodations   183,526    -    5,061    188,587 
    12,524,169    -    739,606    13,263,775 
Cumulative exploration expense – March 31, 2022   63,964,126    59,646    3,089,807    67,113,579 

 

Overall Performance and Results of Operations

 

Total assets decreased to $85,685,553 at March 31, 2023, from $110,687,512 at December 31, 2022, primarily as a result of a decrease in cash of $25,998,999 and investments of $1,911,445, partially offset by an increase in sales taxes recoverable of $2,719,163. The most significant assets at March 31, 2023 were cash of $56,166,274 (December 31, 2022: $82,165,273), investments of $5,589,710 (December 31, 2022: $7,501,155), sales taxes recoverable of $5,863,451 (December 31, 2022: $3,144,288), exploration and evaluation assets of $8,939,009 (December 31, 2022: $8,936,609), and property and equipment of $7,391,105 (December 31, 2022: $7,267,014). Cash decreased by $25,998,999 during the three months ended March 31, 2023 primarily as a result of cash used in operating activities of $25,314,227 and purchases of property and equipment of $643,225.

 

- 63 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Three months ended March 31, 2023 and 2022

 

During the three months ended March 31, 2023, loss from operating activities increased by $9,000,327 to $24,458,213 compared to $15,457,886 for the three months ended March 31, 2022. The increase in loss from operating activities is largely due to:

 

-An increase of $8,383,010 in exploration and evaluation expenditures. Exploration and evaluation expenditures were $21,646,785 for the three months ended March 31, 2023 compared to $13,263,775 for the three months ended March 31, 2022. The Company continued its 500,000 meter diamond drilling program completing approximately 50,324 meters of drilling in 216 holes, commenced a 3D seismic survey and incurred higher drilling, salaries and consulting fees, and assay costs due to an increase in exploration activity at its Queensway Project during the three months ended March 31, 2023 compared to completing approximately 29,038 meters of drilling at its Queensway project during the three months ended March 31, 2022.

 

-An increase of $406,764 in professional fees. Professional fees were $624,478 for the three months ended March 31, 2023 compared to $217,714 for the three months ended March 31, 2022. The Company incurred higher costs for legal and accounting services as a result of increased regulatory compliance during the three months ended March 31, 2023.

 

Other items

 

For the three months ended March 31, 2023, other income was $4,405,870 compared to other expenses of $6,950,933 for the three months ended March 31, 2022. The $11,356,803 change is largely due to:

 

-An increase of $2,188,804 in settlement of flow-through share premium. Settlement of flow-through share premium was $5,454,592 for the three months ended March 31, 2023 compared to $3,265,788 the three months ended March 31, 2022. The Company incurred $20,779,400 of qualifying Canadian exploration expenses and derecognized $5,454,592 of its flow-through share premium liability during the three months ended March 31, 2023.

 

-An increase of $830,069 in interest income. Interest income was $875,174 for the three months ended March 31, 2023 compared to $45,105 for the three months ended March 31, 2022. The increase is due to higher interest rates paid on the Company’s interest bearing cash balances during the three months ended March 31, 2023 compared to lower interest rates paid on the Company’s interest bearing cash balances during the three months ended March 31, 2022.

 

-A decrease of $8,343,154 in net change in unrealized losses on investments. Net change in unrealized losses on investments was $1,911,445 for the three months ended March 31, 2023 compared to $10,254,599 in unrealized losses on investments for the three months ended March 31, 2022. The decrease is due to changes in the fair values of investments held at March 31, 2023.

 

The Company recorded loss and comprehensive loss of $20,052,343 or $0.11 basic and diluted loss per share for the three months ended March 31, 2023 (March 31, 2022: $22,408,819 or $0.14 basic and diluted loss per share).

 

- 64 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Summary of Quarterly Results

 

   2023   2022   2021 
   Mar. 31.
$
   Dec. 31
$
   Sep. 30
$
   Jun. 30
$
   Mar. 31
$
   Dec. 31
$
   Sep. 30
$
   Jun. 30
$
 
Revenues   -    -    -    -    -    -    -    - 
Income (loss) and comprehensive income (loss) for the period   (20,052,343)(2)   (24,658,958)(3)   (18,627,388)(4)   (24,294,494)(5)   (22,408,819)(6)   (13,698,269)(7)   (35,289,366)(8)   3,738,904 
Earnings (loss) per Common Share Basic(1)   (0.11)   (0.14)   (0.11)   (0.15)   (0.14)   (0.09)   (0.23)   0.02 
Earnings (loss) per Common Share Diluted(1)   (0.11)   (0.14)   (0.11)   (0.15)   (0.14)   (0.09)   (0.23)   0.02 

 

  (1) Per share amounts are rounded to the nearest cent, therefore aggregating quarterly amounts may not reconcile to year-to-date per share amounts.
  (2) Decrease in loss and comprehensive loss from prior quarter primarily driven by a decrease in share-based compensation of $6,514,473 and an increase in settlement of flow-through share premium liability of $774,982, partially offset by an increase in net unrealized losses on investments of $2,724,750 and an increase in exploration and evaluation expenditures of $489,264.
  (3) Increase in loss and comprehensive loss from prior quarter primarily driven by an increase in exploration and evaluation expenditures of $1,438,747, an increase in share-based compensation of $6,148,741, partially offset by a decrease in net realized losses on sale of investments of $1,037,858 and an increase in net unrealized gains on investments of $1,104,121.
  (4) Decrease in loss and comprehensive loss from prior quarter primarily driven by a decrease in net realized losses on disposal of investments of $2,599,368 and a decrease in net unrealized losses on investments of $4,916,027, partially offset by an increase in exploration and evaluation expenditures of $2,438,298.
  (5) Increase in loss and comprehensive loss from prior quarter primarily driven by an increase in net realized losses on disposal of investments of $3,637,226 and an increase in exploration and evaluation expenditures of $4,016,701, partially offset by an increase in settlement of flow-through share premium of $1,024,289 and a decrease in net unrealized losses on investments of $5,047,756.
  (6) Increase in loss and comprehensive loss from prior quarter primarily driven by an increase in net unrealized losses on investments of $7,843,296 and an increase in exploration and evaluation expenditures of $1,168,935, partially offset by an increase in settlement of flow-through share premium $348,526.
  (7) Decrease of loss and comprehensive loss from prior quarter primarily driven by a decrease of $21,123,862 in net change in unrealized losses on investments, an increase of $794,521 in settlement of flow-through share premium, offset by a decrease of $499,415 in gain on sale of exploration and evaluation assets.
  (8) Increase in loss and comprehensive loss from prior quarter primarily driven by an increase in net change in unrealized losses on investments of $45,665,743, exploration and evaluation expenditures of $657,261, salaries and consulting of $363,512, offset by a decrease in stock-based compensation of $6,617,299, an increase in settlement of flow-through share premium liability of $730,445 and gain on sale of exploration & exploration assets of $499,415.

 

Liquidity and Capital Resources

 

As at March 31, 2023, the Company had cash of $56,166,274 to settle current liabilities of $21,665,218.

 

The Company does not currently have a recurring source of revenue and has historically incurred negative cash flows from operating activities. As at March 31, 2023, the Company has working capital of $47,554,496 consisting primarily of cash. The Company’s exploration and evaluation assets presently have no proven or probable reserves, and on the basis of information to date, it has not yet determined whether these properties contain economically recoverable resources. The recoverability of amounts shown for exploration and evaluation assets are dependent upon the existence of economically recoverable reserves, the ability of the Company to obtain necessary financing to complete the development of those reserves and upon future profitable production.

 

- 65 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Although the Company presently has sufficient financial resources to cover its existing obligations and operating costs, the Company expects to require further funding in the longer term to fund its planned programs for the next year. Management is actively targeting sources of additional financing through alliances with financial, exploration and mining entities, or other business and financial transactions which would assure continuation of the Company’s operations and exploration programs. In order for the Company to meet its liabilities as they come due and to continue its operations, the Company is solely dependent upon its ability to generate such financing. These items may cast a significant doubt on the company’s ability to continue as a going concern.

 

The sources of funds currently available to the Company for its acquisition and exploration projects are solely due from equity financing. The Company does not have bank debt or banking credit facilities in place as at the date of this report.

 

As at March 31, 2023, the Company had the following commitments (in addition to those disclosed elsewhere in this MD&A):

 

   Total
$
   1 Year
$
   1-3 Years
$
   4-5 Years
$
   After
5 Years
$
 
Lease obligations   338,766    83,097    23,898    24,439    207,332 
Total contractual obligations   338,766    83,097    23,898    24,439    207,332 

 

Property Option Agreement

 

On November 2, 2022, the Company entered into a definitive property option agreement to acquire a 100% interest in five mineral licenses located in Gander, Newfoundland. Under the terms of this agreement, the Company may exercise the option by issuing an aggregate of 487,078 common shares in the capital the Company and making aggregate cash payments of $2,350,000 to the optionors as follows:

 

·$200,000 (paid) and 39,762 common shares (issued) on the later of (i) staking confirmation date as defined in the Option Agreement and (ii) the receipt of the TSX-Venture Exchange’s approval;
·$200,000 and 39,762 common shares on or before November 2, 2023;
·$250,000 and 69,583 common shares on or before November 2, 2024;
·$300,000 and 89,463 common shares on or before November 2, 2025;
·$600,000 and 129,224 common shares on or before November 2, 2026; and
·$800,000 and 119,284 common shares on or before November 2, 2027.

 

At-the-Market Distributions (“ATM”) Program

 

In August 2022, the Company filed a prospectus supplement to its short form base shelf prospectus, pursuant to which the Company may, at its discretion and from time-to-time, sell common shares of the Company for aggregate gross proceeds of up to US$100,000,000. The sale of common shares is to be made through “at-the-market distributions” ("ATM"), as defined in the Canadian Securities Administrators’ National Instrument 44-102 Shelf Distributions, directly on the TSX Venture Exchange and the NYSE American stock exchange.

 

- 66 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Assuming net proceeds of the maximum of US$100,000,000 (less commissions) on or before the expiry of the prospectus on August 22, 2024, the Company intends to use the net proceeds of the offering as follows:

 

Uses of Funds: 

Intended Use of Proceeds

(Estimated)

$

Exploration and drilling at the Queensway Project and commissioning of mineral resource estimate  US$50,000,000 to US$83,000,000
Exploration and drilling at the Lucky Strike Project  US$1,000,000 to US$2,000,000
General, corporate and administrative expenses  US$10,000,000 to US$15,000,000
Total Uses  US$100,000,000  (less commission)

 

Although the Company intends to use the net proceeds from the offering as set forth above, the actual allocation of the net proceeds may vary from those allocations set out above, depending on the amount raised, the time periods in which the proceeds are raised and future developments in relation to the Company’s projects and unforeseen events.

 

During the three months ended March 31, 2023, the Company did not sell any common shares of the Company under the ATM program.

 

During the year ended December 31, 2022, the Company sold 500,229 common shares of the Company under the ATM program at an average price of $5.10 for gross proceeds of $2,549,677, or net proceeds of $2,489,754, and paid an aggregate commission of $59,923. The Company incurred $912,359 in professional fees and other direct expenses in connection with the prospectus offering and the ATM, which is included in the statements of changes in equity for the year ended December 31, 2022.

 

Subsequent to March 31, 2023, the Company sold 648,000 common shares of the Company under the ATM program at an average price of $6.87 per share for gross proceeds of $4,449,403 or net proceeds of $4,344,840, and paid an aggregate commission of $104,563.

 

As at the date of this report, the Company completed $6,999,080 of the ATM program. These proceeds have not been utilized yet.

 

Prior Financings

 

December 14, 2022 Financing – Net Proceeds of $47,282,373

 

On December 14, 2022, the Company completed a bought-deal prospectus offering of 6,250,000 flow-through common shares at a price of $8.00 per common share for gross proceeds of $50,000,000. The Company paid share issuance costs of $2,717,627 in cash of which $2,104,250 was paid to the underwriters. The premium received on the flow-through shares issued was determined to be $14,500,000.

 

Uses of Funds: 

Intended Use of
Proceeds

(Estimated)

$

  

Actual Use of
Proceeds

$

  

Over/(Under)-
Expenditure at

March 31, 2023

$

 
Queensway Project work program   50,000,000    -    50,000,000 
Total Uses   50,000,000    -    50,000,000 

 

As at March 31, 2023, the Company must spend $50,000,000 of Qualifying CEE by December 31, 2023 to satisfy its remaining flow-through liability of $14,500,000.

 

- 67 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

November 2021 Financing – Net Proceeds of $47,384,035

 

On November 24, 2021, the Company completed a non-brokered private placement financing of 5,000,000 flow-through common shares of the Company at a price of $9.60 per common share for gross proceeds of $48,000,000. The Company paid share issuance costs of $615,965 in cash of which $480,000 were finder’s fees. The premium received on the flow-through shares issued was determined to be $12,600,000.

 

Uses of Funds: 

Intended Use of
Proceeds

(Estimated)

$

  

Actual Use of
Proceeds

$

  

Over/(Under)-
Expenditure at

March 31, 2023

$

 
Queensway Project work program   48,000,000    47,585,685    (414,315)
Total Uses   48,000,000    47,585,685    (414,315)

 

As at March 31, 2023, the Company must spend another $414,315 of Qualifying CEE by November 24, 2023 to satisfy its remaining current flow-through liability of $108,758.

 

August 2020 Initial Public Offering – Net Proceeds of $28,488,581

 

On August 11, 2020, the Company completed an initial public offering of 21,000,000 common shares at a price of $1.30 per share for gross proceeds of $27,300,000 and on August 14, 2020, its agents exercised their overallotment option in full to offer and sell an additional 3,150,000 common shares for gross proceeds of $4,095,000.

 

The Company paid share issuance costs of $2,906,419 in cash and issued 1,379,768 agents’ warrants with a fair value of $771,769. The agents’ warrants are exercisable into common shares of the Company at $1.30 for 12 months from the date of issue in connection with the initial public offering.

 

Uses of Funds: 

Intended Use of
Proceeds

(Estimated)

$

  

Actual Use of
Proceeds

$

  

Over/(Under)-
Expenditure at

March 31, 2023

$

 
Queensway Project work program   21,735,000    18,959,341    (2,775,659)
General and administrative expenses   4,505,000    4,505,000    - 
Working Capital to fund ongoing operations   5,155,000    5,155,000    - 
Total Uses   31,395,000    28,619,341    (2,775,659)

 

Outstanding Share Data

 

There were no common shares issued during the three months ended March 31, 2023.

 

On November 16, 2022, the Company issued 39,762 common shares with a value of $194,834 pursuant to the acquisition of exploration and evaluation assets in accordance with the terms of certain property option agreements.

 

On December 14, 2022, the Company completed a bought-deal prospectus offering of 6,250,000 flow-through common shares at a price of $8.00 per common share for gross proceeds of $50,000,000. The Company paid share issuance costs of $2,717,627 in cash of which $2,104,250 was paid to the underwriters. The premium received on the flow-through shares issued was determined to be $14,500,000.

 

- 68 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

During the year ended December 31, 2022, 4,341,875 stock options were exercised at a weighted average exercise price of $1.76 per share for gross proceeds of $7,649,906.

 

During the year ended December 31, 2022, 39,960 warrants were exercised at a weighted average exercise price of $1.38 per share for gross proceeds of $55,140.

 

Subsequent to March 31, 2023, the Company sold 648,000 common shares of the Company under the ATM program at an average price of $6.87 per share for gross proceeds of $4,449,403 or net proceeds of $4,344,840, and paid an aggregate commission of $104,563.

 

Subsequent to March 31, 2023, 1,500 stock options with an exercise price of $5.68 per share were exercised for gross proceeds of $8,520 and 5,625 stock options with an exercise price of $5.68 per share expired.

 

As at March 31, 2023, there were 175,377,526 common shares issued and outstanding. As at the date of this report, there were 176,027,026 shares issued and outstanding.

 

As at March 31, 2023, there were 12,582,250 stock options and no warrants outstanding. As at the date of this report, there were 12,575,125 stock options and no warrants outstanding.

 

Related Party Transactions

 

All transactions with related parties have occurred in the normal course of operations and on terms and conditions that are similar to those of transactions with unrelated parties and are measured at the amount of consideration paid or received. A summary of the Company’s related party transactions with corporations having similar directors and officers is as follows:

 

   Three months ended March 31, 
   2023
$
   2022
$
 
Amounts paid to EarthLabs Inc. (i) exploration and evaluation   (4,500)   (178,242)

 

(i)EarthLabs Inc. (formerly Goldspot Discoveries Inc.) is a related entity having the following common director and officer to the Company: Denis Laviolette, Director and President.

 

As at March 31, 2023 and December 31, 2022, there were no amounts payable to related parties for exploration and evaluation expenditures.

 

There are no ongoing contractual commitments resulting from these transactions with related parties.

 

Key management personnel compensation

 

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of executive and non-executive members of the Company’s Board of Directors and corporate officers.

 

- 69 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

   Salaries and
Consulting
$
   Share-based
compensation
$
   Three months ended
March 31, 2023
$
 
Executive Chairman and Chief Executive Officer   97,200    -    97,200 
President   68,040    -    68,040 
Chief Financial Officer   29,160    -    29,160 
Chief Operating Officer   63,180    -    63,180 
Chief Development Officer   84,240    82,917    167,157 
Non-executive directors   54,000    -    54,000 
Total   395,820    82,917    478,737 

 

   Salaries and
Consulting
$
   Share-based
compensation
$
   Three months ended
March 31, 2022
$
 
Executive Chairman   90,000          -    90,000 
Former Chief Executive Officer   90,000    -    90,000 
President   63,000    -    63,000 
Chief Financial Officer   27,000    -    27,000 
Chief Operating Officer   58,500    -    58,500 
Non-executive directors   24,000    -    24,000 
Total   352,500    -    352,500 

 

As at March 31, 2023, there was $20,450 payable to key management personnel in respect of key management compensation and expense reimbursements included in accounts payable and accrued liabilities (December 31, 2022 - $276,016). The amounts are unsecured, non-interest bearing and without fixed terms of repayment.

 

Under the terms of their management agreements, certain officers of the Company are entitled to 18 months of base pay in the event of their agreements being terminated without cause.

 

Risks and Uncertainties

 

The risks and uncertainties described in this section are considered by management to be the most important in the context of the Company's business. The risks and uncertainties below are not inclusive of all the risks and uncertainties the Company may be subject to and other risks may exist. The Company is in the business of acquiring, exploring and evaluating gold properties. It is exposed to a number of risks and uncertainties that are common to other gold mining companies. The industry is capital intensive at all stages and is subject to variations in commodity prices, market sentiment, inflation and other risks.

 

Exploration Stage Company

 

The Company is an exploration stage company and cannot give any assurance that a commercially viable deposit, or “reserve,” exists on any properties for which the Company currently has or may have (through potential future joint venture agreements or acquisitions) an interest. Determination of the existence of a reserve depends on appropriate and sufficient exploration work and the evaluation of legal, economic, and environmental factors. If the Company fails to find a commercially viable deposit on any of its properties, its financial condition and results of operations will be materially adversely affected.

 

No Mineral Resources

 

Currently, there are no mineral resources (within the meaning of NI 43-101) on any of the properties in which the Company has an interest and the Company cannot give any assurance that any mineral resources will be identified. If the Company fails to identify any mineral resources on any of its properties, its financial condition and results of operations will be materially adversely affected.

 

- 70 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Reliability of Historical Information

 

The Company has relied on, and the disclosure in the Queensway Technical Report is based, in part, upon, historical data compiled by previous parties involved with the Queensway Project. To the extent that any of such historical data is inaccurate or incomplete, the Company’s exploration plans may be adversely affected.

 

Mineral Exploration and Development

 

Resource exploration and development is a speculative business, characterized by a number of significant risks including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but from finding mineral deposits which, though present, are insufficient in quantity and quality to return a profit from production. The marketability of minerals acquired or discovered by the Company may be affected by numerous factors which are beyond the control of the Company and which cannot be accurately predicted, such as market fluctuations, the proximity and capacity of milling facilities, mineral markets and processing equipment and such other factors as government regulations, including regulations relating to royalties, allowable production, importing and exporting of minerals and environmental protection, the combination of which factors may result in the Company not receiving an adequate return of investment capital. There is no assurance that the Company’s mineral exploration and any development activities will result in any discoveries of commercial bodies of ore. The long-term profitability of the Company’s operations will in part be directly related to the costs and success of its exploration programs, which may be affected by a number of factors. Substantial expenditures are required to establish reserves through drilling and to develop the mining and processing facilities and infrastructure at any site chosen for mining. Substantial expenditures are required to establish ore reserves through exploration and drilling, to develop metallurgical processes to extract the metal from the ore and, in the case of new properties, to develop the mining and processing facilities and infrastructure at any site chosen for mining. Although substantial benefits may be derived from the discovery of a major mineralized deposit, no assurance can be given that minerals will be discovered in sufficient quantities and grades to justify commercial operations or that funds required for development can be obtained on a timely basis.

 

Estimates of reserves, mineral deposits and production costs can also be affected by such factors as environmental permitting regulations and requirements, weather, environmental factors, unforeseen technical difficulties, unusual or unexpected geological formations and work interruptions. In addition, the grade of ore ultimately mined may differ from that indicated by drilling results. Short term factors relating to reserves, such as the need for orderly development of ore bodies or the processing of new or different grades, may also have an adverse effect on mining operations and on the results of operations. Material changes in ore reserves, grades, stripping ratios or recovery rates may affect the economic viability of any project.

 

Competition and Mineral Exploration

 

The mineral exploration industry is intensely competitive in all of its phases and the Company must compete in all aspects of its operations with a substantial number of large established mining companies with greater liquidity, greater access to credit and other financial resources, newer or more efficient equipment, lower cost structures, more effective risk management policies and procedures and/or greater ability than the Company to withstand losses. The Company's competitors may be able to respond more quickly to new laws or regulations or emerging technologies or devote greater resources to the expansion of their operations, than the Company can. In addition, current and potential competitors may make strategic acquisitions or establish cooperative relationships among themselves or with third parties. Competition could adversely affect the Company's ability to acquire suitable new mineral properties or prospects for exploration in the future. Competition could also affect the Company's ability to raise financing to fund the exploration and development of its properties or to hire qualified personnel. The Company may not be able to compete successfully against current and future competitors, and any failure to do so could have a material adverse effect on the Company's business, financial condition or results of operations.

 

- 71 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Additional Funding

 

The exploration and development of the Company’s mineral properties will require substantial additional capital. When such additional capital is required, the Company will need to pursue various financing transactions or arrangements, including joint venturing of projects, debt financing, equity financing or other means. Additional financing may not be available when needed or, if available, the terms of such financing might not be favorable to the Company and might involve substantial dilution to existing shareholders. The Company may not be successful in locating suitable financing transactions in the time period required or at all. A failure to raise capital when needed would have a material adverse effect on the Company’s business, financial condition and results of operations. Any future issuance of securities to raise required capital will likely be dilutive to existing shareholders. In addition, debt and other debt financing may involve a pledge of assets and may be senior to interests of equity holders. The Company may incur substantial costs in pursuing future capital requirements, including investment banking fees, legal fees, accounting fees, securities law compliance fees, printing and distribution expenses and other costs.

 

The ability to obtain needed financing may be impaired by such factors as the capital markets (both generally and in the gold and copper industries in particular), the Company’s status as a new enterprise with a limited history, the location of the Company’s mineral properties, the price of commodities and/or the loss of key management personnel.

 

Permits and Government Regulation

 

The future operations of the Company may require permits from various federal, state, provincial and local governmental authorities and will be governed by laws and regulations governing prospecting, development, mining, production, export, taxes, labour standards, occupational health, waste disposal, land use, environmental protections, mine safety and other matters.

 

Although Canada has a favorable legal and fiscal regime for exploration and mining, including a relatively simple system for the acquisition of mineral titles and relatively low tax burden, possible future government legislation, policies and controls relating to prospecting, development, production, environmental protection, mining taxes and labour standards could cause additional expense, capital expenditures, restrictions and delays in the activities of the Company, the extent of which cannot be predicted.

 

Before development and production can commence on any properties, the Company must obtain regulatory and environmental approvals. There is no assurance that such approvals can be obtained on a timely basis or at all. The cost of compliance, with changes in governmental regulations, has the potential to reduce the profitability of operations. The Company is currently in compliance with all material regulations applicable to its exploration activities.

 

Limited Operating History

 

The Company has a limited operating history and its mineral properties are exploration stage properties. As such, the Company will be subject to all of the business risks and uncertainties associated with any new business enterprise, including under-capitalization, cash shortages, limitations with respect to personnel, financial and other resources and lack of revenues. The current state of the Company’s mineral properties require significant additional expenditures before any cash flow may be generated. Although the Company possesses an experienced management team, there is no assurance that the Company will be successful in achieving a return on shareholders’ investment and the likelihood of success of the Company must be considered in light of the problems, expenses, difficulties, complications and delays frequently encountered in connection with the establishment of any business. There is no assurance that the Company can generate revenues, operate profitably, or provide a return on investment, or that it will successfully implement its plans.

 

- 72 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

An investment in the Company’s securities carries a high degree of risk and should be considered speculative by purchasers. There is no assurance that we will be successful in achieving a return on shareholders’ investment and the likelihood of our success must be considered in light of our early stage of operations. You should consider any purchase of the Company’s securities in light of the risks, expenses and problems frequently encountered by all companies in the early stages of their corporate development.

 

Title Risks

 

Although the Company has or will receive title opinions for any properties in which it has a material interest, there is no guarantee that title to such properties will not be challenged or impugned. The Company has not conducted surveys on all of the claims in which it holds direct or indirect interests. The Company’s properties may be subject to prior unregistered agreements or transfers or native land claims and title may be affected by unidentified or unknown defects. Title insurance is generally not available for mineral properties and the Company's ability to ensure that it has obtained secure claims to individual mineral properties or mining concessions may be constrained.

 

A successful challenge to the Company’s title to a property or to the precise area and location of a property could cause delays or stoppages to the Company’s exploration, development or operating activities without reimbursement to the Company. Any such delays or stoppages could have a material adverse effect on the Company’s business, financial condition and results of operations.

 

Laws and Regulation

 

The Company’s exploration activities are subject to extensive federal, provincial and local laws and regulations governing prospecting, development, production, exports, taxes, labour standards, occupational health and safety, mine safety and other matters in all the jurisdictions in which it operates. These laws and regulations are subject to change, can become more stringent and compliance can therefore become more costly. The Company applies the expertise of its management, advisors, employees and contractors to ensure compliance with current laws.

 

Uninsured and Underinsured Risks

 

The Company faces and will face various risks associated with mining exploration and the management and administration thereof. Some of these risks are not insurable; some may be the subject of insurance which is not commercially feasible for the Company. Those insurances which are purchased will have exclusions and deductibles which may eliminate or restrict recovery in the event of loss. In some cases, the amount of insurance purchased may not be adequate in amount or in limit.

 

The Company will undertake intermittent assessments of insurable risk to help ensure that the impact of uninsured/underinsured loss is minimized within reason. Risks may vary from time to time within this intermittent period due to changes in such things as operations operating conditions, laws or the climate which may leave the Company exposed to periods of additional uninsured risk.

 

In the event risk is uninsurable, at its reasonable and sole discretion, the Company may endeavor to implement policies and procedures, as may be applicable and/or feasible, to reduce the risk of related loss.

 

- 73 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Public Health Crises such as the COVID-19 Pandemic

 

In December 2019, a novel strain of coronavirus known as COVID-19 surfaced in Wuhan, China and has spread around the world causing significant business and social disruption. COVID-19 was declared a worldwide pandemic by the World Health Organization on March 11, 2020. The speed and extent of the spread of COVID-19 and the duration and intensity of resulting business disruption and related financial and social impact, are uncertain. Such adverse effects related to COVID-19 and other public health crises may be material to the Company. The impact of COVID-19 and efforts to slow the spread of COVID-19 could severely impact the exploration and any development of the Queensway Project and the Company’s other mineral projects.

 

To date, a number of governments have declared states of emergency and have implemented restrictive measures such as travel bans, quarantine and self-isolation. If the exploration and any development of the Queensway Project and other mineral projects is disrupted or suspended as a result of these or other measures, it may have a material adverse impact on the Company’s financial position and results of operations.

 

COVID-19 and efforts to contain it may have broad impacts on the Company’s supply chain or the global economy, which could have a material adverse effect on the Company’s financial position. While governmental agencies and private sector participants are seeking to mitigate the adverse effects of COVID-19, and the medical community is seeking to develop vaccines and other treatment options, the efficacy and timing of such measures is uncertain.

 

Global Economy Risk

 

The volatility of global capital markets over the past several years has generally made the raising of capital by equity or debt financing more difficult. The Company may be dependent upon capital markets to raise additional financing in the future. As such, the Company is subject to liquidity risks in meeting its operating expenditure requirements and future development cost requirements in instances where adequate cash positions are unable to be maintained or appropriate financing is unavailable. These factors may impact the ability to raise equity or obtain loans and other credit facilities in the future and on terms favourable to the Company and its management.

 

Our business, financial condition and results of operations may be negatively affected by economic and other consequences from Russia’s military action against Ukraine and the sanctions imposed in response to that action

 

In late February 2022, Russia launched a large scale military attack on Ukraine. The invasion significantly amplified already existing geopolitical tensions among Russia, Ukraine, Europe, NATO and the West, including Canada. In response to the military action by Russia, various countries, including Canada, the United States, the United Kingdom and European Union issued broad-ranging economic sanctions against Russia. Such sanctions included, among other things, a prohibition on doing business with certain Russian companies, large financial institutions, officials and oligarchs; a commitment by certain countries and the European Union to remove selected Russian banks from the Society for Worldwide Interbank Financial Telecommunications, or SWIFT, the electronic banking network that connects banks globally; a ban of oil imports from Russia to the United States; and restrictive measures to prevent the Russian Central Bank from undermining the impact of the sanctions. Additional sanctions may be imposed in the future.

 

- 74 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Such sanctions (and any future sanctions) and other actions against Russia may adversely impact, among other things, the Russian economy and various sectors of the economy, including but not limited to, financials, energy, metals and mining, engineering and defense and defense-related materials sectors; result in a decline in the value and liquidity of Russian securities; result in boycotts, tariffs, and purchasing and financing restrictions on Russia’s government, companies and certain individuals; weaken the value of the ruble; downgrade the country’s credit rating; freeze Russian securities and/or funds invested in prohibited assets and impair the ability to trade in Russian securities and/or other assets; and have other adverse consequences on the Russian government, economy, companies and region. Further, several large corporations and U.S. states have announced plans to divest interests or otherwise curtail business dealings with certain Russian businesses.

 

The ramifications of the hostilities and sanctions may not be limited to Russia, Ukraine and Russian and Ukrainian companies and may spill over to and negatively impact other regional and global economic markets (including Europe, Canada and the United States), companies in other countries (particularly those that have done business with Russia and Ukraine) and on various sectors, industries and markets for securities and commodities globally, such as oil and natural gas. Accordingly, the actions discussed above and the potential for a wider conflict could increase financial market volatility and cause severe negative effects on regional and global economic markets, industries, and companies. In addition, Russia may take retaliatory actions and other countermeasures, including cyberattacks and espionage against other countries and companies around the world, which may negatively impact such countries and companies.

 

The extent and duration of the military action or future escalation of such hostilities, the extent and impact of existing and future sanctions, market disruptions and volatility, and the result of any diplomatic negotiations cannot be predicted.

 

While we expect any direct impacts to our business to be limited, the indirect impacts on the economy and on the mining industry and other industries in general could negatively affect our business and may make it more difficult for us to raise equity or debt financing. In addition, the impact of other current macro-economic factors on our business, which may be exacerbated by the war in Ukraine – including inflation, supply chain constraints and geopolitical events – is uncertain. If these levels of volatility persist or if there is a further economic slowdown, the Company's operations, the Company's ability to raise capital could be adversely impacted. In addition, COVID-19, and any future emergence and spread of similar pathogens, could have a material adverse impact on global economic conditions, which may adversely impact: the Company’s operations, its ability to raise debt or equity financing for the purposes of mineral exploration and development, and the operations of the Company’s suppliers, contractors and service providers.

 

Environmental Risks

 

The Company’s activities are subject to extensive laws and regulations governing environment protection. The Company is also subject to various reclamation related conditions. Although the Company closely follows and believes it is operating in compliance with all applicable environmental regulations, there can be no assurance that all future requirements will be obtainable on reasonable terms. Failure to comply may result in enforcement actions causing operations to cease or be curtailed and may include corrective measures requiring capital expenditures. Intense lobbying over environmental concerns by non-governmental organizations has caused some governments to cancel or restrict development of mining projects. Current publicized concern over climate change may lead to carbon taxes, requirements for carbon offset purchases or new regulation. The costs or likelihood of such potential issues to the Company cannot be estimated at this time.

 

The legal framework governing this area is constantly developing, therefore the Company is unable to fully ascertain any future liability that may arise from the implementation of any new laws or regulations, although such laws and regulations are typically strict and may impose severe penalties (financial or otherwise). The proposed activities of the Company, as with any exploration, may have an environmental impact which may result in unbudgeted delays, damage, loss and other costs and obligations including, without limitation, rehabilitation and/or compensation.

 

- 75 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

There is also a risk that the Company’s operations and financial position may be adversely affected by the actions of environmental groups or any other group or person opposed in general to the Company’s activities and, in particular, the proposed exploration and mining by the Company within the Provinces of Newfoundland and Ontario.

 

Social and Environmental Activism

 

There is an increasing level of public concern relating to the effects of mining on the nature landscape, in communities and on the environment. Certain non-governmental organizations, public interest groups and reporting organizations (“NGOs”) who oppose resource development can be vocal critics of the mining industry. In addition, there have been many instances in which local community groups have opposed resource extraction activities, which have resulted in disruption and delays to the relevant operation. While the Company seeks to operate in a social responsible manner and believes it has good relationships with local communities in the regions in which it operates, NGOs or local community organizations could direct adverse publicity against and/or disrupt the operations of the Company in respect of one or more of its properties, regardless of its successful compliance with social and environmental best practices, due to political factors, activities of unrelated third parties on lands in which the Company has an interest or the Company’s operations specifically. Any such actions and the resulting media coverage could have an adverse effect on the reputation and financial condition of the Company or its relationships with the communities in which it operations, which could have a material adverse effect on the Company’s business, financial condition, results of operations, cash flows or prospects.

 

Dependence on Management and Key Personnel

 

The success of the Company is currently largely dependent on the performance of its directors and officers. The loss of the services of any of these persons could have a materially adverse effect on the Company’s business and prospects. There is no assurance the Company can maintain the services of its directors, officers or other qualified personnel required to operate its business. As the Company’s business activity grows, the Company will require additional key financial, administrative and mining personnel as well as additional operations staff. There can be no assurance that these efforts will be successful in attracting, training and retaining qualified personnel as competition for persons with these skill sets increase.

 

If the Company is not successful in attracting, training and retaining qualified personnel, the efficiency of its operations could be impaired, which could have an adverse impact on the Company’s operations and financial condition. In addition, the COVID-19 pandemic may cause the Company to have inadequate access to available skilled workforce and qualified personnel, which could have an adverse impact on the Company’s financial performance and financial condition.

 

First Nations Land Claims

 

Certain of the Company’s mineral properties may now or in the future be the subject of First Nations land claims. The legal nature of First Nations land claims is a matter of considerable complexity. The impact of any such claim on the Company’s material interest in the Company’s mineral properties and/or potential ownership interest in the Company’s mineral properties in the future, cannot be predicted with any degree of certainty and no assurance can be given that a broad recognition of First Nations rights in the areas in which the Company’s mineral properties are located, by way of negotiated settlements or judicial pronouncements, would not have an adverse effect on the Company’s activities.

 

Even in the absence of such recognition, the Company may at some point be required to negotiate with and seek the approval of holders of First Nations interests in order to facilitate exploration and development work on the Company’s mineral properties, there is no assurance that the Company will be able to establish practical working relationships with the First Nations in the area which would allow it to ultimately develop the Company’s mineral properties.

 

- 76 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Claims and Legal Proceedings

 

The Company and/or its directors and officers may be subject to a variety of civil or other legal proceedings, with or without merit. From time to time in the ordinary course of its business, the Company may become involved in various legal proceedings, including commercial, employment and other litigation and claims, as well as governmental and other regulatory investigations and proceedings. Such matters can be time-consuming, divert management’s attention and resources and cause the Company to incur significant expenses. Furthermore, because litigation is inherently unpredictable, the results of any such actions may have a material adverse effect on the Company’s business, operating results or financial condition.

 

On November 15, 2019, ThreeD Capital Inc. (“ThreeD”) and 1313366 Ontario Inc. (“131” and together with ThreeD, the “Plaintiffs”) each entered into share purchase agreements (the “Share Purchase Agreements”) with Palisades Goldcorp Ltd. (“Palisades”) under which Palisades agreed to purchase the 13,500,000 common shares owned by ThreeD and the 4,000,000 common shares owned by 131 for $0.08 per common share. The transactions closed on November 20, 2019. As a private company with restrictions on the transfer of its common shares, the Company had to approve the proposed transfer, which it did by a consent resolution of the Board.

 

On March 10, 2020, ThreeD and 131 filed a statement of claim in the Ontario Superior Court of Justice against Collin Kettell, Palisades and the Company (the “ThreeD Claim”). Pursuant to the ThreeD Claim, the Plaintiffs are challenging the validity of the sale of 17,500,000 common shares by the Plaintiffs to Palisades on November 20, 2019.

 

ThreeD and 131 claim that at the time of negotiation and execution of the Share Purchase Agreements, Palisades and Mr. Kettell were aware of positive drill results from the Company’s 2019 Drill Program and the results were not disclosed to ThreeD and 131 to their detriment. Palisades and Mr. Kettell strongly deny ThreeD and 131’s allegations. ThreeD and 131 have made specific claims for (a) recission of the Share Purchase Agreements on the basis of oppression or unfair prejudice; (b) or alternatively, damages in the amount of $21,000,000 for the alleged improper actions by ThreeD and 131, (c) a declaration that Palisades and Collin Kettell, as shareholder or director and/or officer of the Company, have had acted in a manner that is oppressive, unfairly prejudicial or unfairly disregarded their interests, (d) a declaration that Palisades and Collin Kettell engaged in insider trading contrary to section 138 of the Securities Act (Ontario), (e) unjust enrichment and (f) interests and costs. Palisades and Mr. Kettell refute each of the specific claims made by the Plaintiffs.

 

The Company filed a statement of defence in response to the ThreeD Claim on June 12, 2020, pursuant to which, among other things, the Company denies that it is a proper party to the ThreeD Claim and the allegations against it therein, including because no relief is claimed against the Company in paragraph 1 of the ThreeD Claim.

 

The action has now progressed through the production of documents and oral examinations for discovery stages. In early 2022, the Plaintiffs formally amended their statement of claim to increase the amount claimed to $229,000,000 and to advance a direct claim of oppressive conduct against the Company. While continuing to deny any and all liability to the Plaintiffs, the Company has amended its defence to include specific denials of the new allegations of oppressive conduct against it. The parties completed an additional round of examinations for discovery in January 2023, following which the plaintiffs set the action down for trial.  The parties have scheduled a mandatory mediation for October 3, 2023. The Company anticipates that the case will not go to trial before 2026.

 

The outcome of this claim cannot be determined at this time and therefore no amount has been accrued for in the financial statements for the three months ended March 31, 2023.

 

- 77 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Conflicts of Interest

 

Most of the Company’s directors and officers do not devote their full time to the affairs of the Company. All of the directors and some of the officers of the Company are also directors, officers and shareholders of other natural resource or public companies, and as a result they may find themselves in a position where their duty to another company conflicts with their duty to the Company. Although the Company has policies which address such potential conflicts and the OBCA has provisions governing directors in the event of such a conflict, none of the Company’s constating documents or any of its other agreements contain any provisions mandating a procedure for addressing such conflicts of interest. There is no assurance that any such conflicts will be resolved in favour of the Company. If any such conflicts are not resolved in favour of the Company, the Company may be adversely affected.

 

Gold and Metal Prices

 

If the Company’s mineral properties are developed from exploration properties to full production properties, the majority of our revenue will be derived from the sale of gold. Therefore, the Company’s future profitability will depend upon the world market prices of the gold for which it is exploring. The price of gold and other metals are affected by numerous factors beyond the Company’s control, including levels of supply and demand, global or regional consumptive patterns, sales by government holders, metal stock levels maintained by producers and others, increased production due to new mine developments and improved mining and production methods, speculative activities related to the sale of metals, availability and costs of metal substitutes. Moreover, gold prices are also affected by macroeconomic factors such as expectations regarding inflation, interest rates and global and regional demand for, and supply of, gold as well as general global economic conditions. These factors may have an adverse effect on the Company’s exploration, development and production activities, as well as on its ability to fund those activities.

 

Additionally, the current COVID-19 pandemic and efforts to contain it, including restrictions on travel and other advisories issued may have a significant effect on gold prices.

 

Negative Cash Flow from Operating Activities

 

The Company has no history of earnings and had negative cash flow from operating activities since inception. The Company’s mineral properties are in the exploration stage and there are no known mineral resources or reserves and the proposed exploration programs on the Company’s mineral properties are exploratory in nature. Significant capital investment will be required to achieve commercial production from the Company’s existing projects. There is no assurance that any of the Company’s mineral properties will generate earnings, operate profitably or provide a return on investment in the future. Accordingly, the Company will be required to obtain additional financing in order to meet its future cash commitments.

 

Going Concern Risk

 

The Company’s financial statements have been prepared on a going concern basis under which an entity is considered to be able to realize its assets and satisfy its liabilities in the ordinary course of business. The Company’s future operations are dependent upon the identification and successful completion of equity or debt financings and the achievement of profitable operations at an indeterminate time in the future. There can be no assurances that the Company will be successful in completing equity or debt financings or in achieving profitability. The financial statements do not give effect to any adjustments relating to the carrying values and classifications of assets and liabilities that would be necessary should the Company be unable to continue as a going concern. These items may cast a significant doubt on the Company’s ability to continue as a going concern.

 

- 78 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Risks Associated with Acquisitions

 

If appropriate opportunities present themselves, the Company may acquire mineral claims, material interests in other mineral claims, and companies that the Company believes are strategic. The Company currently has no understandings, commitments or agreements with respect to any material acquisition, other than as described in this MD&A, and no other material acquisition is currently being pursued. There can be no assurance that the Company will be able to identify, negotiate or finance future acquisitions successfully, or to integrate such acquisitions with its current business. The process of integrating an acquired Company or mineral claims into the Company may result in unforeseen operating difficulties and expenditures and may absorb significant management attention that would otherwise be available for ongoing development of the Company’s business. Future acquisitions could result in potentially dilutive issuances of equity securities, the incurrence of debt, contingent liabilities and/or amortization expenses related to goodwill and other intangible assets, which could materially adversely affect the Company’s business, results of operations and financial condition.

 

Force Majeure

 

The Company’s projects now or in the future may be adversely affected by risks outside the control of the Company, including the price of gold on world markets, labour unrest, civil disorder, war, subversive activities or sabotage, fires, floods, explosions or other catastrophes, pandemics, epidemics or quarantine restrictions.

 

Infrastructure

 

Exploration, development and processing activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power sources and water supply are important elements of infrastructure, which affect access, capital and operating costs. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay exploration or development of the Company’s mineral properties. If adequate infrastructure is not available in a timely manner, there can be no assurance that the exploration or development of the Company’s mineral properties will be commenced or completed on a timely basis, if at all.

 

Furthermore, unusual or infrequent weather phenomena, sabotage, government or other interference in the maintenance or provision of necessary infrastructure could adversely affect our operations.

 

Exploration operations depend on adequate infrastructure. In particular, reliable power sources, water supply, transportation and surface facilities are necessary to explore and develop mineral projects. Failure to adequately meet these infrastructure requirements or changes in the cost of such requirements could affect the Company’s ability to carry out exploration and future development operations and could have a material adverse effect on the Company’s business, financial condition, results of operations, cash flows or prospects.

 

Climate Change Risks

 

The Company acknowledges climate change as an international and community concern and it supports and endorses various initiatives for voluntary actions consistent with international initiatives on climate change. However, in addition to voluntary actions, governments are moving to introduce climate change legislation and treaties at the international, national, state/provincial and local levels. Where legislation already exists, regulation relating to emission levels and energy efficiency is becoming more stringent. Some of the costs associated with reducing emissions can be offset by increased energy efficiency and technological innovation. However, if the current regulatory trend continues, the Company expects that this could result in increased costs at some of its operations in the future.

 

- 79 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The Company and the mining industry are facing continued geotechnical challenges, which could adversely impact the Company’s production and profitability. Unanticipated adverse geotechnical and hydrological conditions, such as landslides, floods, seismic activity, droughts and pit wall failures, may occur in the future and such events may not be detected in advance. Geotechnical instabilities and adverse climatic conditions can be difficult to predict and are often affected by risks and hazards outside of the Company’s control, such as severe weather and considerable rainfall. Geotechnical failures could result in limited or restricted access to mine sites, suspension of operations, government investigations, increased monitoring costs, remediation costs, loss of ore and other impacts, which could cause one or more of the Company’s projects to be less profitable than currently anticipated and could result in a material adverse effect on the Company’s business results of operations and financial position.

 

Information Systems and Cyber Security

 

The Company’s operations depend on information technology (“IT”) systems. These IT systems could be subject to network disruptions caused by a variety of sources, including computer viruses, security breaches and cyber-attacks, as well as disruptions resulting from incidents such as cable cuts, damage to physical plants, natural disasters, terrorism, fire, power loss, vandalism and theft. The Company’s operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as pre-emptive expenses to mitigate the risks of failures. Any of these and other events could result in information system failures, delays and/or increase in capital expenses. The failure of information systems or a component of information systems could, depending on the nature of any such failure, adversely impact the Company’s reputation and results of operations.

 

Although to date the Company has not experienced any material losses relating to cyber-attacks or other information security breaches, there can be no assurance that the Company will not incur such losses in the future.

 

The Company’s risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes and practices designed to protect systems, computers, software, data and networks from attack, damage or unauthorized access remain a priority. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.

 

Critical Accounting Policies and Estimates

 

The Company prepares its financial statements in accordance with IFRS as issued by the International Accounting Standards Board (“IASB”).

 

The preparation of the financial statements requires management to make certain estimates, judgments and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and reported amounts of expenses during the reporting period. Actual outcomes could differ from these estimates.

 

The financial statements include estimates which, by their nature, are uncertain. The impacts of such estimates are pervasive throughout the financial statements, and may require accounting adjustments based on future occurrences. Revisions to accounting estimates are recognized in the period in which the estimate is revised and future periods if the revision affects both current and future periods. These estimates are based on historical experience, current and future economic conditions and other factors, including expectations of future events that are believed to be reasonable under the circumstances.

 

- 80 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Significant assumptions about the future and other sources of estimation uncertainty that management has made at period end that could result in a material adjustment to the carrying amounts of assets and liabilities, in the event that actual results differ from assumptions made, relate to the following:

 

(i)              Critical accounting estimates

 

Valuation of Options Granted and Warrants Issued

 

The fair value of common share purchase options granted and warrants issued is determined at the issue date using the Black-Scholes option pricing model. The Black-Scholes model involves six key inputs to determine the fair value of an option, which are: risk-free interest rate, exercise price, market price at the grant date, expected dividend yield, expected life, and expected volatility. Certain of the inputs are estimates that involve considerable judgment and are or could be affected by significant factors that are out of the Company’s control. The Company is also required to estimate the future forfeiture rate of options based on historical information in its calculation of share-based payments expense. These estimates impact the values of stock-based compensation expense, share capital, and reserves.

 

Fair Value of Financial Derivatives

 

Investments in warrants that are not traded on a recognized securities exchange do not have a readily available market value. When there are sufficient and reliable market inputs, a Black-Scholes option pricing model is used. The Black-Scholes model involves six key inputs to determine the fair value of a warrant, which include: risk free interest rate, exercise price, market price at the grant date, expected dividend yield, expected life, and expected volatility. Certain of the inputs are estimates that involve considerable judgment and are or could be affected by significant factors that are out of the Company’s control.

 

Fair Value of Investments in Private Companies

 

The determination of fair value requires judgment and is based on market information, where available and appropriate. All privately-held investments are initially recorded at the transaction price, being the fair value at the time of acquisition. Thereafter, at each reporting period, the fair value of an investment may be adjusted using one or more of the valuation indicators described below.

 

Company-specific information is considered when determining whether the fair value of a privately-held investment should be adjusted upward or downward at the end of each reporting period. In addition to company-specific information, the Company will take into account trends in general market conditions and the share performance of comparable publicly-traded companies when valuing privately-held investments.

 

The absence of the occurrence of any of these events, any significant change in trends in general market conditions, or any significant change in share performance of comparable publicly-traded companies indicates generally that the fair value of the investment has not materially changed.

 

Computation of Income Taxes

 

The determination of tax expense for the period and deferred tax assets and liabilities involves significant estimation and judgment by management. In determining these amounts, management interprets tax legislation in a variety of jurisdictions and make estimates of the expected timing of the reversal of deferred tax assets and liabilities. Management also makes estimates of future earnings which affect the extent to which potential future tax benefits may be used.

 

The Company is subject to assessments by taxation authorities, which may interpret legislation differently. These differences may affect the final amount or the timing of the payment of taxes. We provide for such differences where known based on our best estimate of the probable outcome of these matters.

 

- 81 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Shares Issued to Acquire Exploration and Evaluation Assets

 

From time to time, the Company issues common shares in the course of acquiring exploration and evaluation assets. When shares are issued without cash consideration, the transaction is recognized at the fair value of the assets received. In the event that the fair value of the assets cannot be reliably determined, the Company will recognize the transaction at the fair value of the shares issued. These estimates impact the value of share capital and exploration and evaluation assets.

 

Valuation of flow-through premium

 

The determination of the valuation of flow-through premium is subject to significant judgment and estimates. The flow-through premium is valued as the estimated premium that investors pay for the flow-through feature, being the portion in excess of the market value of shares without the flow-through feature.

 

Reclamation provision

 

The valuation of any reclamation provision is subject to significant judgement and estimates. Assumptions, based on the current economic environment, are made to estimate the future liability. These estimates take into account any material changes to the assumptions that occur when reviewed regularly by management and are based on current regulatory requirements. Significant changes in estimates of discount rate, contamination, restoration standards and techniques will result in changes to the provision from period to period. Actual reclamation and closure costs will ultimately depend on future market prices for the costs which will reflect the market condition at the time the expenditures are actually incurred. The final cost of the reclamation provision currently recognized may be higher or lower than currently provided for.

 

(ii)            Critical accounting judgments

 

Impairment of Exploration and Evaluation Assets

 

Management is required to assess impairment in respect to the Company’s intangible mineral property interests. The triggering events are defined in IFRS 6. In making the assessment, management is required to make judgments on the status of each project and the future plans towards finding commercial reserves. The carrying value of each exploration and evaluation asset is reviewed regularly for conditions that may suggest impairment. This review requires significant judgment.

 

Factors considered in the assessment of asset impairment include, but are not limited to, whether there has been a significant adverse change in the legal, regulatory, accessibility, title, environmental or political factors that could affect the property’s value; whether there has been an accumulation of costs significantly in excess of the amounts originally expected for the property’s acquisition, development or cost of holding; and whether exploration activities produced results that are not promising such that no more work is being planned in the foreseeable future. If impairment is determined to exist, a formal estimate of the recoverable amount is performed and an impairment loss is recognized to the extent that the carrying amount exceeds the recoverable amount. Management has determined that there were no indicators of impairment as at March 31, 2023.

 

Presentation of financial statements as a going concern

 

Presentation of the financial statements as a going concern which assumes that the Company will continue in operation for the foreseeable future, obtain additional financing as required, and will be able to realize its assets and discharge its liabilities in the normal course of operations as they come due involves significant judgment by management.

 

- 82 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Financial Risk Management

 

The Company is exposed in varying degrees to a variety of financial instrument related risks. The Board approves and monitors the risk management processes.

 

Credit Risk

 

Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. The Company does not have financial instruments that potentially subject the Company to credit risk. Overall the Company’s credit risk has not changed significantly from the prior year. Sales taxes recoverable are due from the Canada Revenue Agency and the Company places its cash with financial institutions with high credit ratings, therefore in management’s judgment, credit risk is low.

 

There have been no changes in management’s methods for managing credit risk since December 31, 2022.

 

Liquidity Risk

 

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The Company has in place a planning and budgeting process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its operating and growth objectives. The Company has historically relied on issuance of shares to fund exploration programs and may require doing so again in the future. As at March 31, 2023, the Company has total liabilities of $21,733,749 and cash of $56,166,274 which is available to discharge these liabilities (December 31, 2022– total liabilities of $27,213,612 and cash of $82,165,273). Accordingly, in management’s judgment, liquidity risk is low.

 

There have been no changes in management’s methods for managing liquidity risk since December 31, 2022.

 

Market Risk

 

Market risk is the risk that changes in market prices, such as commodity prices, interest rates and foreign exchange rates will affect the Company’s net earnings or the value of financial instruments. The objective of the Company is to manage and mitigate market risk exposures within acceptable limits, while maximizing returns.

 

(i) Currency Risk

 

Financial instruments that impact the Company’s net earnings or other comprehensive income due to currency fluctuation include cash accounts denominated in US dollars. Fluctuations in the exchange rate between the US dollar and the Canadian dollar at March 31, 2023 would not have a material impact on the Company’s net earnings.

 

(ii)Interest Rate Risk

 

Interest rate risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate due to changes in market interest rates. As the Company deposits its cash into demand accounts with minimal interest rates, the interest rate risk is not significant.

 

(iii)Commodity Price Risk

 

Commodity price risk is defined as the potential adverse impact on earnings and economic value due to commodity price movements and volatilities. The Company’s property has exposure to predominantly gold. Commodity prices, especially gold, greatly affect the value of the Company and the potential value of its property and investments.

 

- 83 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

(iv)Equity Price Risk

 

Equity price risk is the risk that the fair value of or future cash flows from the Company’s financial instruments will significantly fluctuate because of changes in market prices. The Company is exposed to market risk in trading its investments in unfavorable market conditions which could result in dispositions of investments at less than favorable prices. Additionally, the Company adjusts its investments to fair value at the end of each reporting period. This process could result in write-downs of the Company’s investments over one or more reporting periods, particularly during periods of overall market instability. The sensitivity of the Company’s net loss to changes in market prices at March 31, 2023 would change the Company’s net loss by $558,971 as a result of a 10% change in the market price of its investments.

 

There have been no changes in management’s methods for managing market risks since December 31, 2022.

 

Capital management

 

The Company’s objectives when managing capital are:

 

·To safeguard our ability to continue as a going concern in order to develop and operate our current projects;

 

·Pursue strategic growth initiatives; and

 

·To maintain a flexible capital structure which lowers the cost of capital.

 

In assessing our capital structure, we include in our assessment the components of equity consisting of common shares, stock options and warrants, and deficit that as at March 31, 2023 totalled $63,951,804 (December 31, 2022 - $83,473,900). In order to facilitate the management of capital requirements, the Company prepares annual expenditure budgets and continuously monitors and reviews actual and forecasted cash flows. The annual and updated budgets are monitored and approved by the Board of Directors. To maintain or adjust the capital structure, the Company may, from time to time, issue new shares, issue new debt, repay debt or dispose of non-core assets. The Company’s current capital resources are sufficient to carry out our exploration plans and support operations through the current operating period.

 

The Company is not subject to any capital requirements imposed by a regulator.

 

There were no changes in the Company’s approach to capital management during the three months ended March 31, 2023.

 

Disclosure Controls and Procedures

 

The Company’s management, with the participation of its Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), has evaluated the effectiveness of the Company’s disclosure controls and procedures. Based upon the results of that evaluation, the Company’s CEO and CFO have concluded that, as of March 31, 2023, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that the information required to be disclosed by the Company in reports it files is recorded, processed, summarized and reported, within the appropriate time periods and is accumulated and communicated to management, including the CEO and CFO, as appropriate to allow timely decisions regarding required disclosure.

 

- 84 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

Internal Control over Financial Reporting

 

The Company’s management has determined that there have been no significant changes in the Company’s internal control over financial reporting during the three months ended March 31, 2023, that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

 

Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. As a result, even those systems determined to be effective can only provide reasonable assurance regarding the preparation of financial statements.

 

The Company’s management has determined that there have been no significant changes in the Company’s internal control over financial reporting during the three months ended March 31, 2023, that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

 

Cautionary Notes Regarding Forward-Looking Statements

 

This MD&A contains forward looking statements which reflect management's expectations regarding the Company’s future growth, results from operations (including, without limitation, statements about the Company’s opportunities, strategies, competition, expected activities and expenditures as the Company pursues its business plan, the adequacy of the Company’s available cash resources and other statements about future events or results), performance (both operational and financial) and business prospects, future business plans and opportunities. Wherever possible, words such as “predicts”, “projects”, “targets”, “plans”, “expects”, “does not expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative or grammatical variation thereof or other variations thereof, or comparable terminology have been used to identify forward-looking statements. These forward-looking statements include, among other things, statements relating to the Queensway Project and the Company’s planned and future exploration on the Queensway Project and its other mineral properties; the Company’s goals regarding exploration and potential development of its projects; the Company’s future business plans; expectations regarding the ability to raise further capital; the market price of gold; expectations regarding any environmental issues that may affect planned or future exploration and development programs and the potential impact of complying with existing and proposed environmental laws and regulations; the ability to retain and/or maintain any require permits, licenses or other necessary approvals for the exploration or development of its mineral properties; government regulation of mineral exploration and development operations in the Provinces of Newfoundland and Labrador and Ontario; the Company’s compensation policy and practices; the Company’s expected reliance on key management personnel, advisors and consultants; effects of the novel COVID-19 outbreak as a global pandemic; effects of the conflict in Ukraine.

 

Forward-looking statements are not a guarantee of future performance and is based upon a number of estimates and assumptions of management in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances.

 

- 85 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

As of the date of this MD&A, without limitation, assumptions about: the ability to raise any necessary additional capital on reasonable terms to advance exploration and development of the Company’s mineral properties; future prices of gold and other metal prices; the timing and results of exploration and drilling programs; the demand for, and price of gold; that general business and economic conditions will not change in a material adverse manner; the Company’s ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; the geology of the Queensway Project as described in the Queensway Technical Report; the accuracy of budgeted exploration and development costs and expenditures; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; the Company’s ability to attract and retain skilled personnel; political and regulatory stability; the receipt of governmental, regulatory and third-party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; expectations regarding the level of disruption to exploration at the Queensway Project as a result of COVID 19; availability of equipment.

 

Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: the Company may fail to find a commercially viable deposit at any of its mineral properties; there are no resources or mineral reserves on any of the properties in which the Company has an interest; the Company’s plans may be adversely affected by the Company’s reliance on historical data compiled by previous parties involved with its mineral properties; mineral exploration and development are inherently risky; the mineral exploration industry is intensely competitive; additional financing may not be available to the Company when required or, if available, the terms of such financing may not be favourable to the Company; fluctuations in the demand for gold; the Company may not be able to identify, negotiate or finance any future acquisitions successfully, or to integrate such acquisitions with its current business; the Company’s exploration activities are dependent upon the grant of appropriate licenses, concessions, leases, permits and regulatory consents, which may be withdrawn or not granted; the Company’s operations could be adversely affected by possible future government legislation, policies and controls or by changes in applicable laws and regulations; there is no guarantee that title to the properties in which the Company has a material interest will not be challenged or impugned; the Company faces various risks associated with mining exploration that are not insurable or may be the subject of insurance which is not commercially feasible for the Company; public health crises such as the COVID-19 pandemic may adversely impact the Company’s business; the volatility of global capital markets over the past several years has generally made the raising of capital more difficult; compliance with environmental regulations can be costly; social and environmental activism can negatively impact exploration, development and mining activities; the success of the Company is largely dependent on the performance of its directors and officers; the Company’s operations may be adversely affected by First Nations land claims; the Company and/or its directors and officers may be subject to a variety of legal proceedings, the results of which may have a material adverse effect on the Company’s business; the Company may be adversely affected if potential conflicts of interests involving its directors and officers are not resolved in favour of the Company; the Company’s future profitability may depend upon the world market prices of gold; dilution from future equity financing could negatively impact holders of the Company’s securities; failure to adequately meet infrastructure requirements could have a material adverse effect on the Company’s business; the Company’s projects now or in the future may be adversely affected by risks outside the control of the Company; the Company is subject to various risks associated with climate change; other factors discussed under “Risk and Uncertainties”.

 

Although the Company has attempted to identify important factors that could cause actual actions, events, conditions, results, performance or achievements to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, conditions, results, performance or achievements to differ from those anticipated, estimated or intended.

 

- 86 -

Management’s Discussion and Analysis

For the three months ended March 31, 2023 and 2022

 

The Company cautions that the foregoing lists of important assumptions and factors are not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained herein. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking statements.

 

Forward-looking statements contained herein are made as of the date of this MD&A and the Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

 

Off-Balance Sheet Arrangements

 

The Company does not utilize off-balance sheet arrangements.

 

Proposed Transactions

 

There are no proposed transactions at the date of this report.

 

Additional Information

 

Additional information relating to the Company is available on SEDAR at www.sedar.com.

 

- 87 -